9
1
2
3
Installation
Motor side
Free side
Passing the cable through the motor
side plate.
Motor side :
Push the tube so that the motor side is
fitted properly against the wall.
Free side :
Tightening ring
TUBE LEVEL ADJUSTMENT
TUBE INSTALLATION ON THE SUPPORTS
VERTICAL ADJUSTMENT ON THE TUBE / POOL
Adjustment
cover pit
Motor side
Free side
x4
x4
Nut
M8
n°13
n°13
x4
x4
Nut
M8
x1
Allen key
n°4
moteur cable
Washer
Ø8,4 x 24
Washer
Ø8,4 x 24
Содержание RollEnergy Evolution
Страница 1: ......
Страница 15: ...15 Seal for wooden decking DECKING INSTALLATION I n s t a l l a t i o n...
Страница 28: ...29 I n s t a l l a t i o n...