7
Installation
- Fit the template and
mark the position of the
drill holes. Drill holes can
be positioned quickly
using a template.
- The water level must be
below the support screws.
- Clean the drillings.
- If there is water in the pool, put a support on the water (Polystyrene plate) to protect
the water against dusts during the drilling.
TEMPLATE
DRILLING
Ø12
80 mm “minimum”
Straight radius
Radius or cut sides
Sécuriwall
with coping stone
Water
Middle of the template
Middle of the template
Middle of the template
C + 25 mm
C - 25 mm
Water
C + 25 mm
C - 25 mm
Water
C =
I
/ 2
C =
I
/ 2
I
I
C + 25 mm
C =
I
/ 2
C - 25 mm
I
eau
it)
e
Содержание RollEnergy Evolution
Страница 1: ......
Страница 15: ...15 Seal for wooden decking DECKING INSTALLATION I n s t a l l a t i o n...
Страница 28: ...29 I n s t a l l a t i o n...