3
®
Grounding
When grounding the battery string, proper techniques
should be applied per electrical standards such as
NEC and/or Federal, State and Local codes, as well as
User Manual of specific application.
Cabinets
Cabinet systems come factory assembled and
prewired. Do not tip or turn cabinets on their sides
when positioning them in their intended installation
area. Cabinets must be used in an upright position.
These systems are pre-connected. Only inter-shelf,
inter-cabinet and connections to the load are required.
See the connection diagram inside the cabinet. Inter-
cabinet and load connection cables are not included.
Racks
Assemble racks in accordance with the intended
arrangement, align with a level and bolt to the floor.
See rack assembly instructions.
Storage / Refresh cont.
7. All requested information on “Refresh Record Form”
in Appendix A should be completed for each refresh
charge.
8. Batteries shall not be stored beyond 12 months.
Storing beyond 12 months will affect warranty.
9. If the storage / refresh requirements cannot be met,
contact East Penn Reserve Power’s Product Support
group for alternate instructions.
INSTALLATION
General
Caution should be taken when installing batteries to
insure no damage occurs. The battery string cabinet,
tray, rack, etc. shall be inspected for sharp edges that
could cause damage to the battery casing. Batteries
shall not be dropped, slid, or placed on rough or
uneven surfaces such as tray lips or grated flooring.
Mishandling of batteries could result in equipment
damage or human injury. East Penn will not be liable
for damage or injury as a result of mishandling or
misuse of the product.
FOR ANY OTHER INSTALLATION ORIENTATION, THE PRODUCT WILL NOT BE WARRANTED.
DEKA FAHRENHEIT BATTERIES ARE TESTED AND APPROVED TO
BE INSTALLED AND OPERATED IN THEIR UPRIGHT POSITION.
Terminals – Upright Position
Terminals – Upright / Front Position
TOP TERMINAL BATTERY
FRONT TERMINAL BATTERY
Содержание fahrenheit
Страница 11: ...P a g e I n t e n t i o n a l l y B l a n k ...