Installation and start up instructions, TAS-331DG
4189300008G (UK)
The voltage inputs are connected as follows, if the current transformers are placed in
other phases than indicated in the above diagram:
2W3/2var3
External current transformer
Connect
connected to
L1 (23 + 24) and L2 (29 + 30)
L1
to term. No. 17
L3
to term. No. 19
L2
to term. No. 21
connected to
L2 (23 + 24) and L3 (29 + 30)
L2
to term. No. 17
L1
to term. No. 19
L3
to term. No. 21
Couplings 1W/1var and 1W4/1var4: Connect terminal No. 17 to the phase to
which the external current transformer is connected.
1W3/1var3:
External current transformer
Connect
- connected to L2
L2
to term. No. 17
L3
to term. No. 19
L1
to term. No. 21
- connected to L3
L3
to term. No. 17
L1
to term. No. 19
L2
to term. No. 21
Connection/set up
The transducer is equipped with a red LED for indication of wrong phase connection
or errors in the calibration / configuration. This LED is placed under the front plate.
The function of the LED are as follows:
Constant light. The wiring may be wrong. There is not equal power direction on all
phases. There must be signal on all inputs to ensure correct testing and current flow
in all phases. Note this function is only activated in coupling 2W3, 2var3 and 3W3(4),
3var3(4).
Fast pulse 5Hz. The calibration data are corrupted. Contact DEIF.
Slow pulse 1Hz. The configuration data are wrong or corrupted. Make a re-
configuration or contact DEIF. About configuration see special manual.