background image

 

COMPLAINT FORM

 

made on

_

 

in connection with complaint no. 

_

 

 

 

 

SUBJECT OF COMPLAINT

 

BOILER TYPE: 

 

Date of boiler production:_

 

 

 

Boiler serial number:

 

 

 

Date of boiler purchase:

 

 

 

CLAIMANT

 

Name and surname 

_

 

 

Detailed address 

_

 

 

Phone no. 

__ 

 

DETAILED DESCRIPTION OF QUALITY FAULTS OR FAULTS RESULTING FROM THE MANUFACTURER’S FAULT

 

 

 
 
 

 

OTHER FAULTS 

_

 

 

 

 

CLAIMANT LODGES WARRANTY CLAIM FOR (SELECT APPROPRIATE):

 

Warranty repair  

Paid repair  

Post-warranty paid repair

 

 

CLAIMANT REQUESTS

_

 

 

 

 

In case of unjustified calling the service, the CLAIMANT agrees to cover the costs incurred by the manufacturer’s 

service.

 

 

 

 

 

(city, date)

 

(sign of claimant)

 

(signature of serviceman)

 

 

REMOVAL OF BOILER’S FAULT 

to be filled by service

 

Date of informing the service technician about fault 

 

 

hour 

  

Name and surname of service technician 

 

 

 

  

 

Way of fault removal 

 

 

 

 

 

 

 

Advice (DESCRIPTION)

_

 

 

 

END OF COMPLAINT

 

Name and surname of service technician

 

 

Fault removal date 

 

 

 

Justness of complaint

_

 

 

Duration of repair

 

 

 

 

Fault (defect) has been removed, the boiler operates correctly. I hereby confirm the removal of the fault. I declare that I have familiarised myself with the conditions of 

warranty on the basis of which I wish to register my complaint and I agree for processing my personal data for complaint register purposes according to art. 6 section 1 

letter a of the general regulation on personal data protection of 27 April 2016 (OJ EU L 119 of 04.05.2016).

 

 

 

 

(city, date)

 

(sign of claimant)

 

(sign of person registering complaint)

 

 

NOTE! In case of the 

unjustified calling of the “DEFRO” service the CLAIMANT covers the labour costs and travel expenses*

 

*cost per man-hour and traveling expenses are calculated according to the current price list available at www.defro.pl.

 

 

31 

Содержание CLEAN HEAT

Страница 1: ...operating manual central heating boiler dws translation of original operating manual edition 12 January 2022 CLEAN HEAT...

Страница 2: ...ation Module B type of project with the requirements specified in Directive 2014 68 EC have been carried out in the presence of the Office of Technical Inspection as the Notified Body UDT CERT No 1433...

Страница 3: ...correctly filled copy of the Warranty Card to the following address DEFRO R Dziube a sp k Centrum Serwisowe Ruda Strawczy ska 103a 26 067 Strawczyn By sending back your warranty card you will be regis...

Страница 4: ...LAINT FORM 31 20 COMPLAINT FORM 33 21 COMPLAINT FORM 35 List of tables Table 1 Equipment of the DWS boiler Table 2 Dimensions of the DWS boiler charging chamber and fuel charging hole Table 3 Basic di...

Страница 5: ...rgin with respect to actual requirements resulting from the building heat balance All the most important information included in the operating manual is distinguished by marks pointing out the user s...

Страница 6: ...nd ash is gravitationally transferred to the ash pan chamber Arrangement of charging furnace and ash pan doors allows easy access to cleaning of charging furnace and ash pan chamber Cleaning doors are...

Страница 7: ...nace chamber the lowest dimension just over the grate and the biggest at the top of the chamber is given Table 2 Dimensions of charging chamber AxB1 B2xC and fuel charging hole D for DWS boilers Pictu...

Страница 8: ...ion 11 connector for installation of return water temperature sensor 12 flue 13 connector for fan supporting the draught 14 flue cleanout opening 15 cover of the side cleanout opening I 16 side cleano...

Страница 9: ...be stored in a non heated room under a roof and with efficient ventilation Prior to installation it is to be determined if all parts have been delivered and if they are in good technical condition In...

Страница 10: ...flammable beech wood oak wood plywood C2 medium flammable pine wood larch wood spruce wood cork sawn wood boards rubber carpet C3 easily flammable asphalt ply celluloid mass polyurethane polystyrene p...

Страница 11: ...not exceed 30 m Values of internal diameters of pipes protecting the boilers assumed according to PN 91 B 02413 are presented in the below table Table 6 Nominal and internal dimensions of safety and...

Страница 12: ...re in a boiler The thermostatic head of the controller under the influence of the water temperature fluctuations using a lever and chain opens or closes a flap in furnace and ash pan doors increasing...

Страница 13: ...sure by not more than 10 In case of exceeding of pressure set water outflows through the discharge conduit what results in a decrease of pressure in the system Water and steam outflowing from the valv...

Страница 14: ...supply with cold water 7 20 19 18 17 2 13 p outflo w 1 boiler 2 domestic hot water pump 3 non return valve 4 central heating pump 5 floor heating pump 6 three way mixing valve 7 accumulation tank 8 t...

Страница 15: ...ney will start from the level of the boiler room floor because flue gases getting out of the boiler should have a reflection possibility It is also important to have a cleanout opening with tight clos...

Страница 16: ...t out through the charging hole seal Picture 15 Correct position of secondary air flow damper of nozzle during firing up the boiler Hint Before charging set the lever of the short cycle to OPEN this w...

Страница 17: ...the factory settings 8 4 LOW TEMPERATURE CORROSION The boilers should be operated with differences between supply and return temperatures within the range of 10 20 C and return water temperature not s...

Страница 18: ...is necessary in the case when low temperatures are maintained for a long time This operation is intended for increasing life of the boiler NOTE The above mentioned operations should be also absolutel...

Страница 19: ...ves Required temperature cannot be reached too low fuel calorific value add fuel of higher calorific value or replace with fuel of required parameters too much chimney s draught use draught regulator...

Страница 20: ...are to be removed immediately 8 In the winter it is not recommended to make heating breaks as water in the system can freeze which is particularly dangerous as starting up the boiler when the central...

Страница 21: ...f purchase c brief description of fault d boiler protection system type of the expansion vessel e detailed address and phone number of the Purchaser If the following cases are complained about incorre...

Страница 22: ...lements lack of spare parts at the supplier adverse weather conditions force majeure 6 Failure to carry out repairs within this period cannot constitute a ground for any claims against DEFRO R Dziube...

Страница 23: ...d central heating system safety fittings in accordance with PN EN 12828 safety valve manometer air vent BVTS valve cooling coil pipe capacity of membrane expansion vessel in accordance with PN EN 1282...

Страница 24: ...ire quenching system and pipe testing BVTS valve and FIREFIGHTER system checking connection of fuel charger container with the boiler charging fuel container with fuel checking coal charging by the ch...

Страница 25: ...iler room distance from gear motor to wall on the side of the container II CENTRAL HEATING SYSTEM Notes central heating system open leading of expansion pipe in accordance with PN B 02413 1991 locatio...

Страница 26: ...quenching system and pipe testing BVTS valve and FIREFIGHTER system checking the connection of fuel charger container with the boiler charging fuel container with fuel checking coal charging by the ch...

Страница 27: ...operation permit issued by the given Office of Technical Inspection UDT DWS boilers are intended for use in an open central heating system according to the PN 91 B 02413 They can be used in central he...

Страница 28: ...28 17 CARRIED OUT WARRANTY REPAIRS AND MAINTENANCE No Date Fault description repaired elements description of repairs Notes Stamp and signature of Service 1 2 3 4 5 6 7 8 9 10...

Страница 29: ...on an operation permit issued by the given Office of Technical Inspection UDT DWS boilers are intended for use in an open central heating system according to the PN 91 B 02413 They can be used in cen...

Страница 30: ...30...

Страница 31: ...and surname of service technician Way of fault removal Advice DESCRIPTION _ END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint_ Duration of repair Fault...

Страница 32: ...32...

Страница 33: ...and surname of service technician Way of fault removal Advice DESCRIPTION _ END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint_ Duration of repair Fault d...

Страница 34: ...34...

Страница 35: ...ame and surname of service technician Way of fault removal Advice DESCRIPTION _ END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint_ Duration of repair Fau...

Страница 36: ...36...

Страница 37: ...pivoting lid 2 1 Screw M5 2 pcs 1 2 Limiter 1 pcs 2 1 STEP 1 Slide the limiter on the locking screw STEP 2 Fix the limiter using M5 screws Picture 19 Installation of the limiter of the pivoting lid St...

Страница 38: ...38 1 Levelling leg 4 pcs 2 M12 nut 8 pcs Picture 21 Installation of boiler leveling legs 2 1...

Страница 39: ...39...

Страница 40: ...t or briquette no Sawdust moisture 50 no Other wooden biomass no Non wooden biomass no Hard coal yes 75 60 30 700 350 Brown coal including briquette no Coke no Anthracite no Briquettes made of mixed f...

Страница 41: ...t or briquette no Sawdust moisture 50 no Other wooden biomass no Non wooden biomass no Hard coal yes 75 60 30 700 350 Brown coal including briquette no Coke no Anthracite no Briquettes made of mixed f...

Страница 42: ...t or briquette no Sawdust moisture 50 no Other wooden biomass no Non wooden biomass no Hard coal yes 77 60 30 700 350 Brown coal including briquette no Coke no Anthracite no Briquettes made of mixed f...

Страница 43: ...and address of the equipment supplier DEFRO R Dziube a sp ka komandytowa 26 067 Strawczyn Ruda Strawczy ska 103A EQUIPMENT PARAMETERS UNIT MODEL IDENTIFICATION DWS 12 DWS 17 DWS 22 Energy efficiency c...

Отзывы: