background image

4

 

 

Table of contents

 

1.

 

GENERAL INFORMATION ............................................................................................................................................................................................ 5

 

2.

 

INTENDED USE OF BOILER ........................................................................................................................................................................................ 6

 

3.

 

BOILER DESCRIPTION ................................................................................................................................................................................................. 6

 

4.

 

BOILER EQUIPMENT .................................................................................................................................................................................................... 6

 

5.

 

FUEL PARAMETERS.

 ................................................................................................................................................................................................... 6

 

6.

 

TECHNICAL DATA ......................................................................................................................................................................................................... 7

 

7.

 

BOILER TRANSPORT AND INSTALLATION. ............................................................................................................................................................... 9

 

7.1.

 

Transport and storage.................................................................................................................................................................................................. 9

 

7.2.

 

Boiler room requirements. ........................................................................................................................................................................................... 9

 

7.3.

 

Location of the boiler in a boiler room ....................................................................................................................................................................... 10

 

7.4.

 

Connection of boiler to heating system ..................................................................................................................................................................... 10

 

7.4.1.

 

Cooperation with accumulation tank .................................................................................................................................................................. 10

 

7.4.2.

 

Guidelines concerning installation and protection of heating boilers in the open system.................................................................................. 11

 

7.4.3.

 

Guidelines concerning installation and protection of heating boilers in the closed system. .............................................................................. 12

 

7.4.4.

 

Diagram for connecting boiler to heating system ............................................................................................................................................... 13

 

7.5.

 

Connecting boiler to chimney. ................................................................................................................................................................................... 15

 

8.

 

BOILER USAGE AND OPERATION. .......................................................................................................................................................................... 15

 

8.1.

 

Filling with water ........................................................................................................................................................................................................ 15

 

8.2.

 

Boiler's first start-up /information for service/............................................................................................................................................................. 15

 

8.3.

 

Boiler's start-up and usage (information for user). .................................................................................................................................................... 16

 

8.4.

 

Low-temperature corrosion ........................................................................................................................................................................................ 17

 

8.5.

 

Damping a boiler. ....................................................................................................................................................................................................... 17

 

8.6.

 

Periodical service of boiler - cleaning and maintenance ........................................................................................................................................... 17

 

8.7.

 

Boiler emergency shut-down ..................................................................................................................................................................................... 18

 

8.8.

 

Measures in case of fire in the flue /soot ignition/...................................................................................................................................................... 18

 

8.9.

 

Switching off the boiler ............................................................................................................................................................................................... 18

 

9.

 

REMARKS ON BOILER USAGE. ................................................................................................................................................................................ 19

 

10.

 

BOILER REMOVAL DUE TO WEAR OUT. ............................................................................................................................................................... 19

 

11.

 

EXAMPLES OF BREAK-DOWNS AND TROUBLESHOOTING. .............................................................................................................................. 19

 

12.

 

SAFETY OPERATION CONDITIONS ........................................................................................................................................................................ 20

 

13.

 

PRODUCT WARRANTY TERMS AND CONDITIONS.

 ............................................................................................................................................ 21

 

13.1.

 

Warranty conditions “48h Service”

 .......................................................................................................................................................................... 22

 

13.2.

 

Post-warranty services ............................................................................................................................................................................................ 22

 

14.

 

PROTOCOL OF TECHNICAL CONDITION OF BOILER ROOM, CENTRAL HEATING SYSTEM AND FIRST START-UP OF THE BOILER

 .... 23

 

15.

 

PROTOCOL OF TECHNICAL CONDITION OF BOILER ROOM, CENTRAL HEATING SYSTEM AND FIRST START-UP OF THE BOILER /copy to 

send back/.

 ................................................................................................................................................................................................................... 25

 

16.

 

WARRANTY CARD.

................................................................................................................................................................................................... 27

 

17.

 

CARRIED OUT WARRANTY REPAIRS AND MAINTENANCE. .............................................................................................................................. 28

 

18.

 

WARRANTY CARD /copy to send back/. ................................................................................................................................................................ 29

 

19.

 

COMPLAINT FORM ................................................................................................................................................................................................... 31

 

20.

 

COMPLAINT FORM

 ................................................................................................................................................................................................... 33

 

21.

 

COMPLAINT FORM

 ................................................................................................................................................................................................... 35

 

 

 
 

 

List of tables:

 

Table 1. Equipment of the DWS boiler.

 

Table 2. Dimensions of the DWS boiler charging chamber and fuel charging hole. 

 

Table 3. Basic dimensions of the DWS boilers.

 

Table 4. Technical data of the DWS boilers.

 

Table 5. Fire rating for building compounds and materials.

 

Table 6. Nominal and internal dimensions of safety and expansion pipes. 

 

Table 7. Water expansion.

 

Table 8. Exemplary values of pressure coefficient.  

Table 9. Exemplary selection of membrane expansion vessel  

Table 10. Examples of break-downs and troubleshooting.

 

 

 

List of pictures:

 

Picture 1. Dimensions of the DWS boiler charging chamber and fuel charging 

hole. 

 

Picture 2. Basic dimensions of the DWS boilers.

 

Picture 3. Basic components of DWS boilers.  

Picture 4

.

 Location of the boiler in a boiler room.

 

Picture 5. Protection diagram for a water heating system.

 

Picture  6.  Exemplary  protections  diagram  for  DWS  boiler  in  open  system. 

 

Picture 7. Exemplary protection diagrams for a water heating system in a closed 

system.

 

Picture 8. Exemplary protections diagram for boiler in closed system.

 

Picture 10 Simplified diagram presenting open heating system. 

 

Picture 11. Simplified diagram presenting closed heating system. 

 

Picture 12. Sealing method of ceramic catalysts in furnace chamber.

 

Picture 13. Correct position of the lever of the short cycle during firing-up the 

boiler.

 

 

 
 

 

 

Picture 14. Correct position of secondary air flow damper in charging doors during 

firing-up the boiler

 

Picture 15. Correct position of secondary air flow damper of the nozzle during firing-

up the boiler.

 

Picture 16. Correct position of fuel in the combustion chamber.  

Picture 17. Swirlers cleaning method.

 

Picture 18. Installation of the pivoting lid.  

Picture 19. Installation of the limiter of the pivoting lid.

 

Picture 20. Instruction for installation of adjusting handwheel of the pivoting lid.  

Picture 21. Installation of boiler leveling legs.

 

Содержание CLEAN HEAT

Страница 1: ...operating manual central heating boiler dws translation of original operating manual edition 12 January 2022 CLEAN HEAT...

Страница 2: ...ation Module B type of project with the requirements specified in Directive 2014 68 EC have been carried out in the presence of the Office of Technical Inspection as the Notified Body UDT CERT No 1433...

Страница 3: ...correctly filled copy of the Warranty Card to the following address DEFRO R Dziube a sp k Centrum Serwisowe Ruda Strawczy ska 103a 26 067 Strawczyn By sending back your warranty card you will be regis...

Страница 4: ...LAINT FORM 31 20 COMPLAINT FORM 33 21 COMPLAINT FORM 35 List of tables Table 1 Equipment of the DWS boiler Table 2 Dimensions of the DWS boiler charging chamber and fuel charging hole Table 3 Basic di...

Страница 5: ...rgin with respect to actual requirements resulting from the building heat balance All the most important information included in the operating manual is distinguished by marks pointing out the user s...

Страница 6: ...nd ash is gravitationally transferred to the ash pan chamber Arrangement of charging furnace and ash pan doors allows easy access to cleaning of charging furnace and ash pan chamber Cleaning doors are...

Страница 7: ...nace chamber the lowest dimension just over the grate and the biggest at the top of the chamber is given Table 2 Dimensions of charging chamber AxB1 B2xC and fuel charging hole D for DWS boilers Pictu...

Страница 8: ...ion 11 connector for installation of return water temperature sensor 12 flue 13 connector for fan supporting the draught 14 flue cleanout opening 15 cover of the side cleanout opening I 16 side cleano...

Страница 9: ...be stored in a non heated room under a roof and with efficient ventilation Prior to installation it is to be determined if all parts have been delivered and if they are in good technical condition In...

Страница 10: ...flammable beech wood oak wood plywood C2 medium flammable pine wood larch wood spruce wood cork sawn wood boards rubber carpet C3 easily flammable asphalt ply celluloid mass polyurethane polystyrene p...

Страница 11: ...not exceed 30 m Values of internal diameters of pipes protecting the boilers assumed according to PN 91 B 02413 are presented in the below table Table 6 Nominal and internal dimensions of safety and...

Страница 12: ...re in a boiler The thermostatic head of the controller under the influence of the water temperature fluctuations using a lever and chain opens or closes a flap in furnace and ash pan doors increasing...

Страница 13: ...sure by not more than 10 In case of exceeding of pressure set water outflows through the discharge conduit what results in a decrease of pressure in the system Water and steam outflowing from the valv...

Страница 14: ...supply with cold water 7 20 19 18 17 2 13 p outflo w 1 boiler 2 domestic hot water pump 3 non return valve 4 central heating pump 5 floor heating pump 6 three way mixing valve 7 accumulation tank 8 t...

Страница 15: ...ney will start from the level of the boiler room floor because flue gases getting out of the boiler should have a reflection possibility It is also important to have a cleanout opening with tight clos...

Страница 16: ...t out through the charging hole seal Picture 15 Correct position of secondary air flow damper of nozzle during firing up the boiler Hint Before charging set the lever of the short cycle to OPEN this w...

Страница 17: ...the factory settings 8 4 LOW TEMPERATURE CORROSION The boilers should be operated with differences between supply and return temperatures within the range of 10 20 C and return water temperature not s...

Страница 18: ...is necessary in the case when low temperatures are maintained for a long time This operation is intended for increasing life of the boiler NOTE The above mentioned operations should be also absolutel...

Страница 19: ...ves Required temperature cannot be reached too low fuel calorific value add fuel of higher calorific value or replace with fuel of required parameters too much chimney s draught use draught regulator...

Страница 20: ...are to be removed immediately 8 In the winter it is not recommended to make heating breaks as water in the system can freeze which is particularly dangerous as starting up the boiler when the central...

Страница 21: ...f purchase c brief description of fault d boiler protection system type of the expansion vessel e detailed address and phone number of the Purchaser If the following cases are complained about incorre...

Страница 22: ...lements lack of spare parts at the supplier adverse weather conditions force majeure 6 Failure to carry out repairs within this period cannot constitute a ground for any claims against DEFRO R Dziube...

Страница 23: ...d central heating system safety fittings in accordance with PN EN 12828 safety valve manometer air vent BVTS valve cooling coil pipe capacity of membrane expansion vessel in accordance with PN EN 1282...

Страница 24: ...ire quenching system and pipe testing BVTS valve and FIREFIGHTER system checking connection of fuel charger container with the boiler charging fuel container with fuel checking coal charging by the ch...

Страница 25: ...iler room distance from gear motor to wall on the side of the container II CENTRAL HEATING SYSTEM Notes central heating system open leading of expansion pipe in accordance with PN B 02413 1991 locatio...

Страница 26: ...quenching system and pipe testing BVTS valve and FIREFIGHTER system checking the connection of fuel charger container with the boiler charging fuel container with fuel checking coal charging by the ch...

Страница 27: ...operation permit issued by the given Office of Technical Inspection UDT DWS boilers are intended for use in an open central heating system according to the PN 91 B 02413 They can be used in central he...

Страница 28: ...28 17 CARRIED OUT WARRANTY REPAIRS AND MAINTENANCE No Date Fault description repaired elements description of repairs Notes Stamp and signature of Service 1 2 3 4 5 6 7 8 9 10...

Страница 29: ...on an operation permit issued by the given Office of Technical Inspection UDT DWS boilers are intended for use in an open central heating system according to the PN 91 B 02413 They can be used in cen...

Страница 30: ...30...

Страница 31: ...and surname of service technician Way of fault removal Advice DESCRIPTION _ END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint_ Duration of repair Fault...

Страница 32: ...32...

Страница 33: ...and surname of service technician Way of fault removal Advice DESCRIPTION _ END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint_ Duration of repair Fault d...

Страница 34: ...34...

Страница 35: ...ame and surname of service technician Way of fault removal Advice DESCRIPTION _ END OF COMPLAINT Name and surname of service technician Fault removal date Justness of complaint_ Duration of repair Fau...

Страница 36: ...36...

Страница 37: ...pivoting lid 2 1 Screw M5 2 pcs 1 2 Limiter 1 pcs 2 1 STEP 1 Slide the limiter on the locking screw STEP 2 Fix the limiter using M5 screws Picture 19 Installation of the limiter of the pivoting lid St...

Страница 38: ...38 1 Levelling leg 4 pcs 2 M12 nut 8 pcs Picture 21 Installation of boiler leveling legs 2 1...

Страница 39: ...39...

Страница 40: ...t or briquette no Sawdust moisture 50 no Other wooden biomass no Non wooden biomass no Hard coal yes 75 60 30 700 350 Brown coal including briquette no Coke no Anthracite no Briquettes made of mixed f...

Страница 41: ...t or briquette no Sawdust moisture 50 no Other wooden biomass no Non wooden biomass no Hard coal yes 75 60 30 700 350 Brown coal including briquette no Coke no Anthracite no Briquettes made of mixed f...

Страница 42: ...t or briquette no Sawdust moisture 50 no Other wooden biomass no Non wooden biomass no Hard coal yes 77 60 30 700 350 Brown coal including briquette no Coke no Anthracite no Briquettes made of mixed f...

Страница 43: ...and address of the equipment supplier DEFRO R Dziube a sp ka komandytowa 26 067 Strawczyn Ruda Strawczy ska 103A EQUIPMENT PARAMETERS UNIT MODEL IDENTIFICATION DWS 12 DWS 17 DWS 22 Energy efficiency c...

Отзывы: