![Dea TEO 700 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/dea/teo-700/teo-700_operating-instructions-manual_2460990016.webp)
14
7 START-UP
The start-up phase is very important to ensure maximum security and compliance to regulations, including all the requirements of EN
12445 standard which establishes the test methods for testing the automation for gates.
DEA
System reminds that all installation, maintenance, cleaning or repair operations on any part of the system must be performed
exclusively by qualified personnel who must be responsible of all texts requie by the eventual risk;
7.1 Installation test
The testing operation is essential in order to verify the correct installation of the system.
DEA
System wants to summarize the proper
testing of all the automation in 4 easy steps:
• Make sure that you comply strictly as described in paragraph 2 “WARNINGS SUMMARY”;
• Test the opening and closing making sure that the movement of the leaf match as expected. We suggest in this regard to perform
various tests to assess the smoothness of the gate and defects in assembly or adjustment;
• Ensure that all safety devices connected work properly;
• Perform the measurement of impact forces in accordance with the standard 12445 to find the setting that ensures compliance with
the limits set by the standard EN12453.
WARNING
Using spare parts not indicated by
DEA
System and/or incorrect re-assembly can create a risk to people, animals and
property and also damage the product. For this reason, always use only the parts indicated by
DEA
System and scrupulously follow all
assembly instructions.
7.2 Unlocking and Manual operation
In the event of malfunctions or simple power failure, release the motor (Pic. 7) and perform the operation manually.
The knowledge of the unlocking operation is very important, because in times of emergency the lack of timeliness in acting on such
a device can be dangerous.
WARNING
The efficancy and safety of manual operation of the automation is guaranteed by
DEA
System only if the installation has
been installed correctly and with original accessories.
8 MAINTENANCE
Good preventive maintenance and regular inspection ensure
long working life. In the table below you will find a listo f inspections/
maintenance operations to be programmed and executed periodi
-
cally.
Consult the TROUBLE-SHOOTING” table whenever anomalies are
observed in order to find the solution to the problem and contact
DEA
System directly whenever the solution required is not provided.
INTERVENTION TYPE
PERIODICITY
Chain and rotating joints lubrication
6 months
Check screws screwdown
6 months
Check chain tension
6 months
TROUBLE-SHOOTING
Description
Causes
Possible solutions
The chain is noisy.
Chain is not sufficiently in tension.
Properly adjust the tension of the chain by
tightening the M8 nut (Pic. 6).
The operator does not start.
The power plug is not properly inserted or
the fuse is damaged.
Check the correct insertion of the power
plug or replace the fuse.
After learning the opening/closing position
the operator does not start.
The track fixing screws are not properly
tightened or some errors occurred during
the learning procedure.
Tighten the track fixing screws or repeat the
operator learning procedure of the stroke.
Door doesn’t close.
The “photocell” function is activated.
Deactivate the “photocell” function.
Push-button works properly, while the remo
-
te does not.
The remote has not been learnt or battery
is low.
Learn the remote or replace the battery.
Transmission distance is too short.
The remote battery is low.
Replace the remote battery.