5 Unpacking and Inspection
5.1 Matters needing attention in unpacking and inspecting goods
5.1.1 Check whether the product nameplate is consistent with the supply list information
-Figure 4.
Figure 4 Product Nameplate
5.1.2 Check the quantity of each part against the packing list and the material is correct.
5.2 Check Content
Check whether the appearance of the instrument is defective or damaged.
6 Installation
6.1 Installation Tool
Wrenches, flange gaskets and flange bolts for process connections
6.2 Installation Technical Requirements
6.2.1 Before installation, please observe the surface of the float ball carefully to make sure it is
smooth and smooth, and that there is no damage such as depression on the surface of the
magnetic float .
6.2.2 When installing the UQZ magnetic float level transmitter, the housing axis must be
perpendicular to the horizontal plane.
6.3 Installation Procedure
-Figure 5