9
/
14
WWW.DDTOP.COM
Figure4 Sample Nameplate
5.1.2 Check the quantity of each part against the packing list and the material is correct.
5.2 Check Content
5.2.1 Check if the probe is bent, and check the probe at the connection with the meter head.
6. Installation
6.1 Installation Tool
6.1.1 Wrenches, flange gaskets and flange bolts for process connections.
6.1.2 Level
6.2 Installation Technical Requirements
6.2.1 Ensure that the lead length L and inner diameter of the equipment are suitable for the selected float level
controller to ensure that the float is in the tank.
6.2.2 Pay attention to the distance between the tank flange and the inner wall of the tank and the diameter of the
tank when installing, to ensure that the limit bracket is flexible in the tank.
6.2.3 Ensure that the horizontal level of the equipment is within 3 °.