possible.
Then place the components on an anti-static surface until you are
ready to use them.
3.
There are two nylon lifting straps that are used to remove the enclosure
assembly from the box (Figure 15). A forklift or other mechanical lifting
device is highly recommended to remove the unit and to place on the IBM
lift tool.
Figure 15 Unpacking the SS8460
6.
If you are installing the enclosure in a rack: a) Ensure that you have these tools
available: • Phillips screwdriver • Bubble level b) Arrange for assistance during
installation c) Ensure ahead of time that you have chosen a suitable location for the
enclosure or rack assembly.
7.
Ensure that the area around the enclosure or rack assembly has sufficient cooling
and space around the unit to access cabling.
8.
When installing disk modules, allow them to acclimate to room temperature prior to
installation. Disks should be stored at room temperature for at least two hours prior
to use.
6.0.3 Installing the SS8460 in a Rack
The SS8460 enclosure is designed to fit within a 4U rack space. Follow these steps to
mount the enclosure in your rack:
1.
Ensure that you have these rack mount components: • Rack rails (one left, one
right) • Rail installation hardware (screws, screw plates, shelf locking brackets)
Содержание StorageScaler8460
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 13: ...Figure 12 Proper Lift tool Place in Front of the Rack ...
Страница 15: ...3 Re Use the packaging material from the new replacement unit to repack the suspect unit for proper return ...
Страница 22: ...Appendix A Product Specifications ...
Страница 24: ...Figure 18 Zoning Configuration 1 Disk Presentation End of Document ...