Step 21
Fit the panel/s to the assembled frame by placing them between the angled sections as
shown below. Adjust the bottom angled section position by means of the slotted holes in
order to fit the panel/s closely. Fasten the panels through the 6mm holes by means of the
M5 x 16 self drilling screws.
Step 22
Remove the panels for installation on the roof. The completed frame should be fastened to
the roof as appropriate.
19
If un-slit tubular pipe insulation is supplied with the kit then
the insulation tubes can be applied during the piping
installation. This can be achieved by sliding the tubes over
pipe sections before the connectors are tightened.
NOTE
If slit pipe insulation is supplied then pipe insulation can be
applied to all exposed pipes. Use cable ties to secure.
NOTE