15
Step 12
Turn the structure upside down and fasten channel 2 to the top part of channel 3 using M8
x 65 screws and long spacer tubes as shown below on both sides:
Step 13
Fit the two longitudinal channels using M8 x 65 screws and long spacer tubes on both
sides as shown below:
Step 14
Fit channel 4 to channel 3 using M8 x 65 screws and long spacer tubes on both sides as
shown below:
Содержание ULTRASUN UFS
Страница 1: ...Installation Operating Manual ULTRASUN UFS Flatplate Solar Systems ...
Страница 2: ......
Страница 28: ...INS456A 07 20 ...