5.2.1.2. Filling Of Heating System
Filling process is done with blue colour filling tap under the device. This process
must be done by implementing following instructions.
Be sure that inlet tap of boiler is open.
Open the filling tap.
When water pressure indicator reaches between 1-1,5 bar, close the filling tap.
Discharge the accumulated air inside radiators by opening air relief cock placed
in side of radiators and close when water starts to flow.
When the accumalted air inside radiators discharge it can be decrease at heating
system water pressure. Make sure that heating system water pressure is
between 1 and 1,5 bar. If decreases, complete by opening filling valve
After heating system is filled, must be studiously controlled if there is water
leakage or not.
If filling valve is forgot as open and heating system pressure exceeds 3 bar,
drainage starts from safety valve inside device.
Содержание UKDAX-10EBT
Страница 1: ...1...
Страница 5: ...5 3 CONFIGURATION OF THE DEVICE Wall Type Boiler With Tank Floor Type Boiler With Tank...
Страница 6: ...6 Wall Type External Boiler With Tank...
Страница 10: ...10 5 INSTALLATION OF DEVICE Wall Type Boiler With Tank Device installation must be done by authorised personnel...
Страница 13: ...13 Installation Of Floor Type Boiler With Tank UKDAX 80YxxBT UKDAX 80YxxBM...
Страница 14: ...14 UKDAX 120YxxBT UKDAX 120YxxBM...
Страница 15: ...15...
Страница 17: ...17 Plumbing Connection Diagram Of External Boiler With Tank...
Страница 39: ...39 0 is chosen with or symbols for floor heating mode...
Страница 48: ...48 Weekends SUN SAT Weekdays MON TUES WED THUR FRI Days can be chosen one by one...
Страница 56: ...56 7 ELECTRIC DIAGRAM...