21
5.2.1.Connection Of Heating System and Water Installation
Heating system must be drawn with suitable diameter pipe for providing enough
circulation of heating water. Choosing Radiator pipes smaller than it is needed,
fitting constriction or blockage can inability circulation of heating. Connections that
are made to device must be easy removable when it is needed. There must be
separate cut off valve at device radiator inlet and outlet. Also there must be silt trap
at inlet part between valve and device. Valve and still trap must be used at boiler
cold water inlet.
5.2.1.1. Boiler Filling
After installment is completed, boiler is needed to fill. This process must be done by
implementing following instructions.
Open device boiler inlet valve.
Open any tap connected to device hot water outlet. (preferably nearest tap). Air
inside boiler will be discharged from tap.
Close the tap after air discharged from tap and continuous water flow start.
After boiler is filled, must be studiously controlled if there is water leakage or not
.
For
UKDAX-xxHBT ve UKDAX-xxHBM models 50
K NTC boiler sensor is
needed to install
Содержание UKDAX-10EBT
Страница 1: ...1...
Страница 5: ...5 3 CONFIGURATION OF THE DEVICE Wall Type Boiler With Tank Floor Type Boiler With Tank...
Страница 6: ...6 Wall Type External Boiler With Tank...
Страница 10: ...10 5 INSTALLATION OF DEVICE Wall Type Boiler With Tank Device installation must be done by authorised personnel...
Страница 13: ...13 Installation Of Floor Type Boiler With Tank UKDAX 80YxxBT UKDAX 80YxxBM...
Страница 14: ...14 UKDAX 120YxxBT UKDAX 120YxxBM...
Страница 15: ...15...
Страница 17: ...17 Plumbing Connection Diagram Of External Boiler With Tank...
Страница 39: ...39 0 is chosen with or symbols for floor heating mode...
Страница 48: ...48 Weekends SUN SAT Weekdays MON TUES WED THUR FRI Days can be chosen one by one...
Страница 56: ...56 7 ELECTRIC DIAGRAM...