Lower the pile slowly so that the pile can be
correctly inserted into the clamp. Once firmly
inserted, close the jaws.
Manoeuvre the pile to the insertion point and
push the pile slowly into the ground. Plumb
the pile then ensure
all personnel are out of
the High Risk Area.
Start the vibrator and adjust (crowd) the
hydraulic rams so that the vibrator is level
and always sits directly on top of the pile as it
goes into the ground.
When the pile has reached the required depth
turn the vibrator off by returning the control
lever to the central position and allow all
vibrations to stop.
Remove the chain clamp and lifting chain
from the pile lifting hole.