USER’S MANUAL
4
PACKING, TRANSPORT AND STORAGE
ALL PACKING, LIFTING, HANDLING, TRANSPORT AND UNPACKING
OPERATIONS ARE TO BE PERFORMED EXCLUSIVELY BY EXPERT
PERSONNEL
Packing dimension picture
Transport
Packing can be lifted or moved by lift trucks, cranes or bridge cranes. In case
of slinging, a second person must always take care of the load, in order to
avoid dangerous oscillations
.
During loading and unloading operation, goods must be handled by vehicles or ships.
At the arrival of the goods, verify that all items specified in the delivery notes are included. If
finding missing parts, possible defects or damage due to transport, one should examine
damaged cartons according to “Packing List” to verify the condition of damaged goods and
missing parts, also the person in charge or the carrier must be immediately informed.
The machine is heavy goods! Don’t take manpower load and unload and transporting way
into consideration, the safety of working is important.
Furthermore, during loading and unloading operation goods must be handled as shown in the
picture. (Picture 2)
Storage:
-The machine equipment should be stocked in the warehouse, if stocked outside should do the
disposal well of waterproof.
-Use box truck in the process of transport, use container storage when shipping.
-The control box should be placed perpendicularly during the transport; and prevent other
goods from extrusion.
-The temperature for machine storage: -25ºC-- 55ºC
Picture 1 (packing dimension)
Picture 2
(
Goods-lifted
)
Содержание LJS7035
Страница 1: ...USER S MANUAL 1 Small scissor Lift LJS7035 USER USER S S MANUAL MANUAL Operation Manual Instruction ...
Страница 26: ...USER S MANUAL 26 Oil pipe connection diagram ...
Страница 27: ...USER S MANUAL 27 Explosion diagram ...
Страница 28: ...USER S MANUAL 28 CYLINDER CONTROL BOX ...
Страница 29: ...USER S MANUAL 29 Appendix Circuit diagram 380V ...
Страница 30: ...USER S MANUAL 30 Appendix Circuit diagram 220V ...