![Datcon DT9102 I4 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/datcon/dt9102-i4/dt9102-i4_operating-instructions-manual_3732789012.webp)
DT9102 I4
12
20220103-V0
4.3. Mounting procedure
Preparatory steps
1. Cut-out the panel according to the figure shows below.
The cut-out needs special tools, it must be carried out by
trained specialist personnel.
Cut-out dimensions
2. Put on the enclosed seal onto the instrument case from
the rear side and fit it to the instrument front panel back
side.
3. Put the instrument into the prepared cut-out until it
possible and check the seal between the case and the
mounting surface.
Содержание DT9102 I4
Страница 1: ...DT9102 I4 Intrinsically Safe Digital Clock Operating Instructions ...
Страница 11: ...DT9102 I4 20220103 V0 11 4 2 Main dimensions of the instrument ...
Страница 41: ...DT9102 I4 20220103 V0 41 10 2 Application example ...
Страница 50: ...DT9102 I4 50 20220103 V0 10 8 ATEX Certification ...
Страница 51: ...DT9102 I4 20220103 V0 51 ...
Страница 52: ...DT9102 I4 52 20220103 V0 ...
Страница 53: ...DT9102 I4 20220103 V0 53 ...
Страница 54: ...DT9102 I4 54 20220103 V0 ...
Страница 55: ...DT9102 I4 20220103 V0 55 ...
Страница 56: ...DT9102 I4 56 20220103 V0 ...
Страница 57: ...DT9102 I4 20220103 V0 57 ...
Страница 58: ...DT9102 I4 58 20220103 V0 ...
Страница 59: ...DT9102 I4 20220103 V0 59 ...
Страница 60: ...DT9102 I4 60 20220103 V0 ...
Страница 61: ...DT9102 I4 20220103 V0 61 ...
Страница 62: ...DT9102 I4 62 20220103 V0 ...
Страница 63: ...DT9102 I4 20220103 V0 63 ...
Страница 64: ......