5.3. Connecting the signal processing unit and the
power supply
The following figure shows the wiring plan, connecting the
signal processing unit and the power supply:
Wiring plan, connecting
the signal processing
unit and the power
supply
(see also “Application
example”)
Be careful the polarity of
the cables
Checking the
connections
1. Loosen terminal screws.
2. Insert the wire ends into the open terminals according to
the wiring plan.
3. Screw the terminal in.
4. Check the hold of the wires in terminals by pulling on
them firmly.
Check if the cables are connected properly (have you
connected all the cables, have you connected to the right
place, do not the cable-ends touch each other).
The connection is finished.
5.4. Put the instrument under supply voltage.
Put the instrument
under supply voltage
After you have completed the connections, put the
instrument under supply voltage. If the connection is correct
the green indicator give light and you can measure output
current or voltage according to the measured value of the
transmitter.
Содержание DT1315 Series
Страница 1: ...DT1315 xx xx Intrinsically Safe Output Isolators Operating Instructions...
Страница 19: ...DT1315 xx xx 20100826 V0 19 8 2 Application example...
Страница 20: ...DT1315 xx xx 20 20100826 V0 8 3 ATEX Certification...
Страница 21: ...DT1315 xx xx 20100826 V0 21...
Страница 22: ...DT1315 xx xx 22 20100826 V0...
Страница 23: ...DT1315 xx xx 20100826 V0 23...
Страница 24: ...DT1315 xx xx 24 20100826 V0...
Страница 25: ...DT1315 xx xx 20100826 V0 25...
Страница 26: ...DT1315 xx xx 26 20100826 V0...
Страница 27: ...DT1315 xx xx 20100826 V0 27...
Страница 28: ......