background image

 

DT1102 (PS) 

4

 

20220202-V0 

 

start 

1. About this document

 

 

1.1. Function

 

 

This operating instructions manual has all the information you need for 
quick set-up and safe operation of DT1102 (PS) 
Please read this manual before you start setup. 
 

 

1.2. Target group

 

 

This operating instructions manual is directed to trained personnel. 
The contents of this manual should be made available to these 
personnel and put into practice by them. 
 

 

1.3. Symbolism used

 

 

Information, tip, note 

This symbol indicates helpful additional information. 
 

 

Caution, warning, danger 

This symbol informs you of a dangerous situation that could occur. 
Ignoring this cautionary note can impair the person and/or the 
instrument or it’s environ. 
 

 

List 

The dot set in front indicates a list with no implied sequence. 
 

 

Action 

This arrow indicates a single action. 
 

Sequence 

Numbers set in front indicate successive steps in a procedure. 
 

 

Содержание DT1102 (PS)

Страница 1: ...DT1102 PS Switch Configurable I O Galvanic Isolator Operating Instructions...

Страница 2: ...icators configuration switches 8 3 5 Input output signal selection 9 3 6 Storage and transport 10 4 Mounting 11 4 1 General instructions 11 4 2 Main dimensions of the instrument 11 4 3 Mounting proced...

Страница 3: ...ators 20 6 1 First power on 20 6 2 Front panel Indicators 20 7 Fault rectification 21 7 1 Fault finding 21 7 2 Repearing 21 8 Dismounting 22 8 1 Dismounting procedure 22 8 2 Disposal 22 9 Appendix 23...

Страница 4: ...anual should be made available to these personnel and put into practice by them 1 3 Symbolism used Information tip note This symbol indicates helpful additional information Caution warning danger This...

Страница 5: ...hazards or damage to system components through incorrect installing or adjustment 2 4 General safety instructions Using the DT1102 PS requiring the strict observance of standards regulations and guid...

Страница 6: ...s The scope of delivery encompasses DT1102 PS tool for switch setting in case of shipping more instrument only one tool is enclosed documentation this operating instructions manual certification warra...

Страница 7: ...ormation about the operating status of the device power on state error states Principle of operation The input current flows through the measuring resistor or the input voltage divides through the att...

Страница 8: ...ches The following figure shows the indicators and the configuration switches on the DT1102 PS front panel 1 configuration switches for selection input output ranges 2 red error indicator shows the er...

Страница 9: ...0 mA 4 20 mA 0 10 V 2 10 V Default setting 0 20 mA input 0 20 mA output all switches are in off state The following figure shows the input output signal range selection table The following figure show...

Страница 10: ...in places whose climatic conditions are in accordance with chapter 9 1 Technical specification as described under the title Environmental conditions The packaging of DT1102 PS consist of environment f...

Страница 11: ...tion where the operating conditions are in accordance with chapter 9 1 Technical specification as described under the title Operating conditions Mounting position The DT1102 PS is built in a plastic h...

Страница 12: ...mounting doesn t need any tool 1 Tilt the instrument according to the figure put the instrument s mounting hole onto the upper edge of the rail figure step 1 2 Push the instrument s bottom onto the b...

Страница 13: ...oss section insulation screening etc You may use either solid conductor or flexible conductor In case of using flexible conductor use crimped wire end The instrument can be connected with standard two...

Страница 14: ...Be careful the polarity of the cables 1 Loosen terminal screws 2 Insert the wire ends into the open terminals according to the wiring plan 3 Screw the terminal in 4 Check the hold of the wires in term...

Страница 15: ...example Be careful the polarity of the cables 1 Loosen terminal screws 2 Insert the wire ends into the open terminals according to the wiring plan 3 Screw the terminal in 4 Check the hold of the wires...

Страница 16: ...ty of the cables 1 Loosen terminal screws 2 Insert the wire ends into the open terminals according to the wiring plan 3 Screw the terminal in 4 Check the hold of the wires in terminals by pulling on t...

Страница 17: ...areful the polarity of the cables 1 Loosen terminal screws 2 Insert the wire ends into the open terminals according to the wiring plan 3 Screw the terminal in 4 Check the hold of the wires in terminal...

Страница 18: ...areful the polarity of the cables 1 Loosen terminal screws 2 Insert the wire ends into the open terminals according to the wiring plan 3 Screw the terminal in 4 Check the hold of the wires in terminal...

Страница 19: ...en on the data label When the instrument type designation ends with PS then the power supply terminal coloured black 2 Connect only in the complete absence of line voltage 3 Loosen terminal screws 4 I...

Страница 20: ...proper working of the instrument or in certain situation may cause impairment of the instrument 6 2 Front panel Indicators In normal working mode Green on indicator lights red error indicator dark Und...

Страница 21: ...ctive Green on indicator lights red error indicator flashes 1 sec periodically the instrument is defective Improper output signal disconnect the signal processing unit from the output check the input...

Страница 22: ...ep 1 2 Lift the screwdriver handle until it possible to open the fixing assembly figure step 2 3 Keeping the screwdriver in this position lift the instrument bottom from the bottom edge of the rail fi...

Страница 23: ...put resistance 3 M Output parameters voltage Output signal DC voltage Ranges 0 10 V 2 10 V Overdriving ability 11 V Load resistance 500 Output resistance 0 5 Transfer parameters Error of output 25 C 2...

Страница 24: ...ria BURST Analogue input Main supply input PS Analogue outputs 4 kV 5 50 ns 5 kHz 2 kV 5 50 ns 5 kHz 1 kV 5 50 ns 5 kHz A criteria A criteria A criteria SURGE Analogue input Main supply input PS Analo...

Страница 25: ...DT1102 PS 20220202 V0 25 start 9 2 Application example...

Страница 26: ...DT1102 PS 26 20220202 V0...

Страница 27: ...DT1102 PS 20220202 V0 27...

Страница 28: ......

Отзывы: