AP25 Installation and Operating Guide
Page 16
AP25 Installation & Operating Guide
Document # 9301H79500 Ver. 1.00
1.3 Powering ON the AP25 Processor
The main power switch for the AP25 is located on the rear panel. A “hard boot” (cycling the power at
the power entry module on the rear panel) typically takes the system one minute to initialize. When the
main power switch is on, the AP25 can be switched in and out of standby power mode by the pushbutton
power switch on the front panel. A “soft boot” (pressing the power button on the front panel when power
has not been cycled) typically takes about 10 seconds.
While the system is initializing, status messages will appear on the AP25 touch screen.
Figure 2. Initial screen
When the screen messages in the box disappear and the fader value appears, the AP25 is ready.
Figure 3. Home Screen
5
If no messages appear on the touch screen after you have turned on the power switch, check the
following:
Is the power to the sound rack on? Has the circuit breaker to the audio rack been tripped?
Is the power cable connected?
Is the front panel power switch lighted?
Содержание AP25
Страница 46: ...AP25 Installation and Operating Guide Page 46 AP25 Installation Operating Guide Document 9301H79500 Ver 1 00...
Страница 47: ...AP25 Installation and Operating Guide Page 47 AP25 Installation Operating Guide Document 9301H79500 Ver 1 00...
Страница 48: ...AP25 Installation and Operating Guide Page 48 AP25 Installation Operating Guide Document 9301H79500 Ver 1 00...
Страница 49: ...AP25 Installation and Operating Guide Page 49 AP25 Installation Operating Guide Document 9301H79500 Ver 1 00...
Страница 50: ...AP25 Installation and Operating Guide Page 50 AP25 Installation Operating Guide Document 9301H79500 Ver 1 00...
Страница 122: ...AP25 Installation and Operating Guide Version 1 00 Appendix B Interface Wiring Diagrams B 2 Document 9301H79500 Ver 1 00...
Страница 123: ...AP25 Installation and Operating Guide Version 1 00 Appendix B Interface Wiring Diagrams B 3 Document 9301H79500 Ver 1 00...
Страница 124: ...AP25 Installation and Operating Guide Version 1 00 Appendix B Interface Wiring Diagrams B 4 Document 9301H79500 Ver 1 00...
Страница 125: ...AP25 Installation and Operating Guide Version 1 00 Appendix B Interface Wiring Diagrams B 5 Document 9301H79500 Ver 1 00...
Страница 126: ...AP25 Installation and Operating Guide Version 1 00 Appendix B Interface Wiring Diagrams B 6 Document 9301H79500 Ver 1 00...
Страница 127: ...AP25 Installation and Operating Guide Version 1 00 Appendix B Interface Wiring Diagrams B 7 Document 9301H79500 Ver 1 00...
Страница 128: ...AP25 Installation and Operating Guide Version 1 00 Appendix B Interface Wiring Diagrams B 8 Document 9301H79500 Ver 1 00...