DKG-108 User Manual V-1.0
(10.08.2011)
-9-
STEP BY STEP AUTO SETUP
PUSHBUTTON
OPERATION
DISPLAY
In order to enter the auto setup mode, power-
up the unit with
MENU
button pressed and
hold the button pressed for 10 seconds. The
display will show
ctrF
and the unit will ask the
current transformer primary rating.
Press again the
MENU
button. The display will
show the CT primary rating.
Adjust required CT primary rating with arrow
buttons.
For fast increase/decrease please hold the
button pressed.
Press again the
MENU
button. The display will
show
MtEr
and the unit will ask the power
meter type.
Press again the
MENU
button. The display will
show the power meter type.
Adjust required power meter type with arrow
buttons.
0
analog power meter
1
digital power meter
Press again the
MENU
button. The display will
show
LErn
and the unit will ask to enter the
quick commissioning mode.
Press again the
MENU
button. The display will
show 0.
Set the parameter to 1 with arrow buttons.
Press again the
MENU
button. The display will
show the total
kVAr
value.
The unit will check
CT
connections, correct if
necessary, then activate all banks (one by one)
in order to determine capacitor ratings.
When auto setup is finished successfully the
unit will revert to normal operation.