Chapter 1
4
Getting Started Procedure
The flow diagram shown in
illustrates the steps needed to
get started using a DT340 board. This diagram is repeated in each
chapter; the shaded area in the diagram shows you where you are in
the getting started procedure.
Figure 1: Getting Started Flow Diagram
Install the Board and its Accessories
Wire Signals
(see
Verify the Operation of the Board
(see
Configure the Board and
Screw Terminal Panel
(see
)
Prepare to Use a Board
Содержание DT340
Страница 1: ...R DT340 UM 16864 C Getting Started Manual...
Страница 9: ...1 1 Overview DT340 Key Hardware Features 2 DT340 Software 3 Getting Started Procedure 4...
Страница 20: ...Chapter 2 12...
Страница 38: ...Chapter 4 30...
Страница 56: ...Chapter 6 48 13 Click Main Menu 14 Click Exit...
Страница 66: ...Appendix A 58...
Страница 70: ...Index 62...