Chapter 1
4
Getting Started Procedure
The flow diagram shown in
illustrates the steps needed to
get started using a DT300 Series board. This diagram is repeated in
each chapter; the shaded area in the diagram shows you where you
are in the getting started procedure.
Figure 1: Getting Started Flow Diagram
Install the Board and Load the Device
Driver (see
Wire Signals
(see
Verify the Operation of the Board
(see
Attach and Configure the Screw Terminal
Panel and Signal Conditioning Backplane
(see
)
Prepare to Use a Board
Содержание DT300 Series
Страница 1: ...R DT300 Series UM 16503 E Getting Started Manual...
Страница 6: ...Contents vi...
Страница 11: ...1 1 Overview DT300 Series Software 3 Getting Started Procedure 4...
Страница 22: ...Chapter 2 12...
Страница 44: ...Chapter 4 34...
Страница 74: ...Chapter 5 64...
Страница 78: ...Chapter 6 68 13 Click Main Menu 14 Click Exit...
Страница 86: ...Chapter 6 76...