I N S T A L L A T I O N M A N U A L
B 0 9 U L F L I T H I U M B A T T E R Y
R e v . 1
© 2 0 1 9 D a r f o n E l e c t r o n i c s C o r p .
P a g e 1 6 o f 2 8
Step 10 - According to the first battery
pack installation procedure, the
second, third, and fourth battery packs
are sequentially installed, and the
second battery compartment is
fastened to the upper battery
compartment baffle; the third and
fourth battery compartments are
respectively fastened to the first , the
second battery box; (note the
placement of B+ and B-) as shown
above:
Step 11 - Before closing the cabinet,
please refer to Section 6 for DIP
switch settings, System wiring,
Matching resistor installation, and
Grounding
Step 12. - Install the front door: Align the front door hinge with
the hole on the door and press the front door as shown in
①
.
Rotate the front door clockwise to firmly press the front door
and the cabinet, push the handle down from the inside of the
cabinet as shown in
②
, and lock the front door as shown in
③
.
Step 13. - Install the side door: After attaching the side door
to the position, use a screwdriver to lock the 6 screws on
the side door.
○
1
○
2
○
3
Содержание B09ULF
Страница 1: ...INSTALLATION MANUAL B09ULF LITHIUM BATTERY...