DMR-6 Mid-Rise Scissor Lift
8
P/N 5900253 — Rev. A — August 2020
Installation Checklist
Following are the steps needed to install a DMR-6 Lift. Perform them in the order shown.
☐
1. Review the installation Safety Rules.
☐
2. Make sure you have the necessary Tools.
☐
3. Select the Installation Site.
☐
4. Planning for Electrical Work.
☐
5. Check clearances.
☐
6. Unloading and unpacking.
☐
7. Assemble the Portable Stand.
☐
8. Attach the Power Unit to the Portable Stand.
☐
9. Set up the Tow Cart.
☐
10. About Hydraulic Fluid Contamination.
☐
11. About Thread Sealants.
☐
12. Connect the Hydraulic Hoses.
☐
13. Install the Lift Arms.
☐
14. Fill the Hydraulic Fluid Reservoir.
☐
15. Connect the Power Unit.
☐
16. Install a Thermal Disconnect Switch (Electrician
required
).
☐
17. Test the Lift.
☐
18. Review the Final Checklist.
Содержание DMR-6
Страница 29: ...DMR 6 Mid Rise Scissor Lift 29 P N 5900253 Rev A August 2020 Labels...
Страница 30: ...DMR 6 Mid Rise Scissor Lift 30 P N 5900253 Rev A August 2020...
Страница 31: ...DMR 6 Mid Rise Scissor Lift 31 P N 5900253 Rev A August 2020 Parts Diagrams...
Страница 32: ...DMR 6 Mid Rise Scissor Lift 32 P N 5900253 Rev A August 2020...
Страница 33: ...DMR 6 Mid Rise Scissor Lift 33 P N 5900253 Rev A August 2020...
Страница 34: ...DMR 6 Mid Rise Scissor Lift 34 P N 5900253 Rev A August 2020...
Страница 36: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2020 by BendPak Inc All rights reserved Dannmar com...