77

Danfoss District Energy 

VI.HE.M1.02 

DKDHR

Instructions for installation and use 

VX Solo HWS  substations

6.0  Installation instructions, Safety and Handling

Instructions

Please read these instructions carefully before installing and comis-

sioning this substation. The manufacturer accepts no liability for loss or 

damage resulting from failure to comply with these instructions for use.

Read and follow these instructions carefully to prevent the risk of physi-

cal injury and/or damage to persons and property. Exceeding the re-

commended operating parameters considerably increases the risk of 

personal injury and/or damage to property. 

Installation, commissioning and maintenance must be carried out  by 

qualified and authorized personnel in compliance with the local safety 

regulations.

Once the station has been installed and is operating, there is 

normally

 

no need to alter the settings or other functions. The district heating 

substation is very reliable and easy to operate.

Energy source

The substation is primarily designed for connection to district heating. 

Alternative energy sources can be used if the operating conditions are 

equivalent to district heating at all times.

Application

The substation is designed only to operate with water or a water-glycol 

mixture (up to 40%), and other heating media may not be used.   

The substation is to be connected to the household piping in a frost-free 

room,  where the temperature does not exceed 50 °C and the relative 

humidity is not higher than 80%. The substation must no be covered, 

bricked in or otherwise cut off from access.

Choise of materials

Only use materials, that comply with local regulations.

Corrosion

The maximum chloride compounds of the medium must not be higher 

than 300 mg/l. The risk of  corrosion increases considerably if the recom-

mended chloride content is exceeded.

Safety valve(s)

Installation of safety valve(s) must always be in compliance with local 

regulations.

Noise level.

 ≤ 55 dB.

Connection

It must be possible to cut off all energy sources to the unit - includ-

ing electrical connections - at all times.

Warning! Hot surfaces

Parts of the substation may be very hot and can cause burn inju-

ries. Be very careful when you are in the immediate vicinity of the 

substation.

Warning of high pressure and high temperature

The maximum supply temperature in the district heating network 

can be up to 110°C and the operating pressure can be up to 16 bar. 

This may result in a risk of scalding from touching the substation 

and from outflow of the medium (water/steam). Exceeding the 

substation design data and operating parameters for pressure and 

temperature carries an appreciable risk of personal injury and/or 

damage to property.

Emergencies 

In the event of fire, leaks or other hazards, immediately shut off all 

sources of energy to the substation, if possible and call for appropri-

ate assistance. 

If the domestic hot water is discoloured or malodorous, shut off all 

ball valves on the substation, notify all users and call for professional 

assistance immediately.

Warning of damage during transport 

On reception of the substation, and before installing it, check for 

any evidence of damage during transport.

The substation must be handled and moved with the greatest care 

and attention.

NB! - Tightening of connections

Before mounting of the substation, ALL pipe connections MUST 

be retightened, as vibrations during transport may have caused 

leaks. Once the substation has been put into operation ALL pipe 

connections MUST be pressure tested for leaks and retightened 

once more if necessary.

DO NOT OVERTIGHTEN THE PIPE CONNECTIONS – see page 9, 

“Test & connections” for more information.

Storage

Before installation, the units must be stored in a dry, heated (i.e. frost-

free) room.

(Relative humidity max. 80% and storage temperature 5-70 °C).

The units must not be stacked higher than the limit at the factory (max. 

8 layers) Units supplied in cardboard packaging must be lifted using the 

handles incorporated in the packaging. Units must be placed on pallets 

for transport/moving across large distances.

As far as possible, do not lift the substation by the pipes. Lifting by the 

pipes may cause leaks. REMEMBER to retighten.

Handling

We recommend that you wear suitable safety footwear while 

handling and installing the substation.

Disposal

Dispose of the packaging in accordance with the local regulations for 

disposal of used packaging materials.
The substation is made of materials that cannot be disposed of together 

with household waste.  

Close all energy sources and disconnect all connection pipes. Disconnect 

and dismantle the product for disposal in accordance with the applicable 

local regulations for the disposal of the individual components.

Содержание VX Solo HWS

Страница 1: ...Danfoss District Energy MAKING MODERN LIVING POSSIBLE VX Solo HWS Instructions for installation and use...

Страница 2: ...missioning and start up VX Solo HWS 13 10 1 Programmable room thermostat DHW time controller TP9000 13 11 0 Domestic hot water cylinder 16 12 0 Maintenance 17 12 1 Maintenance schedule recommendations...

Страница 3: ...meter 24 Fitting piece for heat meter 3 4 x 110 mm 30 Thermostat AVTB 30 100 C 52 Zone valve Danfoss VMT TWA V 60 Terminal box Terminal box is prepared for wiring of electronic programmable room ther...

Страница 4: ...0 x W 600 x D 400 mm Connections Order 1 Cylinder DHW supply 2 Common return 3 District heating DH return 4 District heating DH supply 5 Heating HE supply Connections size DH G IT HE G IT Cylinder G I...

Страница 5: ...3 point of the DHW cylinder The VX Solo HWS is specificly prepared for connection of a TP9000 programmable room thermostat DHW time controller which allows heating and DHW operation according to dema...

Страница 6: ...ectionconcern ingpumpsintheinstallationandcommissioningsectionsregardingthe individual products Programmable Room thermostat DHW time controller TP9000 The VX Solo HWS is specificly prepared for conne...

Страница 7: ...n Warning of high pressure and high temperature The maximum supply temperature in the district heating network can be up to 110 C and the operating pressure can be up to 16 bar This may result in a ri...

Страница 8: ...Mount the district heating meter see page 10 6 IMPORTANT Tighten all pipe connections as they may have loosened during transport and handling 7 On systems that feature a safety valve establish a drai...

Страница 9: ...t be performed by qualified and authorised personnel Installation must always be performed in accordance with the ap plicable legislation and in compliance with these instructions The substation must...

Страница 10: ...rt gaskets After mounting of heat meter remember to check and tighten all pipe connections before commissioning the heat meter The heat meter is to be installed so that the direction of flow cor respo...

Страница 11: ...cleaning and repairs or Thermal actuatorTWA V Supply voltage 230V a c 50 60 Hz Protection class IP41 Power consumption Average 2Watt For further information please refer to the enclosed instructions...

Страница 12: ...DCW ball valves to be ordered separately Carefully open the fill valve and fill the system with water and at the same time vent the system Fill the heat exchanger the system with water until the ma no...

Страница 13: ...Pump P1 will then be switched on Zone valves thermal actuators TWA A Heating and DHW operation is activated by the programmable room thermostat DHW time controllerTP9000 in connection with a zone valv...

Страница 14: ...egolazione del flusso non avviene SVENSKA AVTB ventiler med liten l ng givare 9 5 180 mm skall monteras i retur ledningen givaren skall placeras varmare n det medium som genom str mmar ventilen Om AVT...

Страница 15: ...en set the pump at lowest possible speed of rotation setting 1 in due consideration of the lectricity consumption and the heating comfort Factory setting of the se lector switch is centre position def...

Страница 16: ...00 mm insertion lengt and is supplied with a BSP 100 mm pocket It has an adjustment range of 0 to 90 C and has SPDT contacts Recommended setting is 60 C Mounting of immersion control thermostat 1 Moun...

Страница 17: ...because aerated water is used on the secondary side If it becomes necessary to clean the exchanger with acid this can be done as shown on the drawing to the right Brazed plate heat exchangers can with...

Страница 18: ...eaks If you identify a leak replace the gaskets and retighten the pipe connec tions Check that the safety valve on the cold water supply is functioning correctly Check the functionality by turning the...

Страница 19: ...f required Defective sensor Replace sensor Defektive actuator Check the functioning of the actuator Defective motor valve or possibly dirt in the valve housing Check the functions of the motor valve c...

Страница 20: ...or correctly Poor cooling Strainer clogged Clean strainer Too small heating surface too small radiators compared to the total heating requirement of the building Increase total heating surface Poor ut...

Страница 21: ...id solution or replace heating element Inadequate cylinder capacity Wait for heating loading of the cylinder You may check the specifications of the manufacturer conc cylinder capacity Long waiting ti...

Страница 22: ...tubes Automatic controls wrongly set Check that the controller has been cor rectly set see separate instructions Immersion sensor placed incorrectly Place immersion sensor correctly in ac cordance wi...

Страница 23: ...N 61000 6 1 2007 Electromagnetic compatibility Generic standard Immunity for residential commercial and light industry EN 61000 6 2 2005 Electromagnetic compatibility Generic standard Immunity industr...

Страница 24: ...o comply with all technical regulations and the applicable legislation in every respect Installation and commissioning must only be performed by trained authorised personnel The substation is checked...

Страница 25: ...25 25 Danfoss District Energy VI HE M1 02 DKDHR Instructions for installation and use VX Solo HWS substations...

Страница 26: ...26 DKDHR VI HE M1 02 Danfoss District Energy Instructions for installation and use VX Solo HWS substations...

Страница 27: ...27 27 Danfoss District Energy VI HE M1 02 DKDHR Instructions for installation and use VX Solo HWS substations...

Страница 28: ...uced by Danfoss Redan A S 04 2012 VI HE M1 02 Danfoss Randall Ltd District Energy Ampthill Road DK Bedford MK42 9ER Tel 0845 1217 400 Fax 0845 1217 515 danfossrandall danfoss com www danfoss randall c...

Отзывы: