12.0  Maintenance

Maintenance work

Is only to be carried out by qualified and authorised personnel.

Inspection

The substation should be checked regularly by authorised personnel. 

Any necessary maintenance must be performed in accordance with the 

instructions in this manual and other sets of instructions.

During service the dirt strainers are to be cleaned – including the filter 

on the controller, all pipe connections must be tightened and the safety 

valve must be function tested by turning the lever.

Rinsing/cleaning of plate heat exchanger

To clean the plate heat exchanger, rinse it by running clean water 

through the exchanger at high speed and in the opposite direction to 

the normal flow. This will remove any dirt deposits that may have built 

up in the exchanger. If rinsing with clean water is not sufficient, the 

exchanger can also be cleaned by circulating a cleaning agent approved 

by Danfoss (e.g. Kaloxi or Radiner Fl cleaning fluid) through the 

exchanger. Both these cleaning fluids are environmentally friendly and 

can be disposed off through the standard sewer system. After use of 

a cleaning fluid, the plate heat exchanger must be rinsed thoroughly 

with clean water.

Acid cleaning of plate heat exchanger

Deposits of limescale may build up in plate heat exchangers for domestic 

hot water on account of the large temperature fluctuations, and because 

aerated water is used on the secondary side. If it becomes necessary 

to clean the exchanger with acid, this can be done as shown on the 

drawing to the right. Brazed plate heat exchangers can withstand 

rinsing with a dilute acid solution - e.g. 5% formic, acetic or phosphoric 

acid).

Measures after maintenance work

After maintenance work and before commissioning:

–   Check that all screwed connections are tight.

–   Check that all safety features, covers, that were removed, have been 

replaced properly.

–   Clean the working area and remove any spilled materials.

–   Clear all tools, materials and other equipment from the working area.

–   Connect to energy supply and check for leaks.

–   Vent the system.

–   Carry out any necessary adjustment again.

–   Make sure that all safety features on the device and the system work 

properly.

Meter reading

The caretaker/owner must perform visual checking and reading of

the energy meter at short, regular intervals. 

Service procedures must only be performed by trained, authorised

personnel. 

NB! Excessive consumption for whatever reason is not covered by

the Danfoss warranty.

Cooling / Return temperature reading

Cooling – i.e. the difference between the supply and return temperature

of the district heating water – has a significant effect on overall energy 

economy. Therefore, it is important to focus on the supply and return 

temperature in the heating system. The difference should typically be 

30–35°C. Please note that a low district heating return temperature is 

directly related to the return temperature from the heating circuit and 

the return temperature of the circulation water.

It is therefore important to focus on these return temperatures.

 

Содержание VX Solo HWS

Страница 1: ...Danfoss District Energy MAKING MODERN LIVING POSSIBLE VX Solo HWS Instructions for installation and use...

Страница 2: ...missioning and start up VX Solo HWS 13 10 1 Programmable room thermostat DHW time controller TP9000 13 11 0 Domestic hot water cylinder 16 12 0 Maintenance 17 12 1 Maintenance schedule recommendations...

Страница 3: ...meter 24 Fitting piece for heat meter 3 4 x 110 mm 30 Thermostat AVTB 30 100 C 52 Zone valve Danfoss VMT TWA V 60 Terminal box Terminal box is prepared for wiring of electronic programmable room ther...

Страница 4: ...0 x W 600 x D 400 mm Connections Order 1 Cylinder DHW supply 2 Common return 3 District heating DH return 4 District heating DH supply 5 Heating HE supply Connections size DH G IT HE G IT Cylinder G I...

Страница 5: ...3 point of the DHW cylinder The VX Solo HWS is specificly prepared for connection of a TP9000 programmable room thermostat DHW time controller which allows heating and DHW operation according to dema...

Страница 6: ...ectionconcern ingpumpsintheinstallationandcommissioningsectionsregardingthe individual products Programmable Room thermostat DHW time controller TP9000 The VX Solo HWS is specificly prepared for conne...

Страница 7: ...n Warning of high pressure and high temperature The maximum supply temperature in the district heating network can be up to 110 C and the operating pressure can be up to 16 bar This may result in a ri...

Страница 8: ...Mount the district heating meter see page 10 6 IMPORTANT Tighten all pipe connections as they may have loosened during transport and handling 7 On systems that feature a safety valve establish a drai...

Страница 9: ...t be performed by qualified and authorised personnel Installation must always be performed in accordance with the ap plicable legislation and in compliance with these instructions The substation must...

Страница 10: ...rt gaskets After mounting of heat meter remember to check and tighten all pipe connections before commissioning the heat meter The heat meter is to be installed so that the direction of flow cor respo...

Страница 11: ...cleaning and repairs or Thermal actuatorTWA V Supply voltage 230V a c 50 60 Hz Protection class IP41 Power consumption Average 2Watt For further information please refer to the enclosed instructions...

Страница 12: ...DCW ball valves to be ordered separately Carefully open the fill valve and fill the system with water and at the same time vent the system Fill the heat exchanger the system with water until the ma no...

Страница 13: ...Pump P1 will then be switched on Zone valves thermal actuators TWA A Heating and DHW operation is activated by the programmable room thermostat DHW time controllerTP9000 in connection with a zone valv...

Страница 14: ...egolazione del flusso non avviene SVENSKA AVTB ventiler med liten l ng givare 9 5 180 mm skall monteras i retur ledningen givaren skall placeras varmare n det medium som genom str mmar ventilen Om AVT...

Страница 15: ...en set the pump at lowest possible speed of rotation setting 1 in due consideration of the lectricity consumption and the heating comfort Factory setting of the se lector switch is centre position def...

Страница 16: ...00 mm insertion lengt and is supplied with a BSP 100 mm pocket It has an adjustment range of 0 to 90 C and has SPDT contacts Recommended setting is 60 C Mounting of immersion control thermostat 1 Moun...

Страница 17: ...because aerated water is used on the secondary side If it becomes necessary to clean the exchanger with acid this can be done as shown on the drawing to the right Brazed plate heat exchangers can with...

Страница 18: ...eaks If you identify a leak replace the gaskets and retighten the pipe connec tions Check that the safety valve on the cold water supply is functioning correctly Check the functionality by turning the...

Страница 19: ...f required Defective sensor Replace sensor Defektive actuator Check the functioning of the actuator Defective motor valve or possibly dirt in the valve housing Check the functions of the motor valve c...

Страница 20: ...or correctly Poor cooling Strainer clogged Clean strainer Too small heating surface too small radiators compared to the total heating requirement of the building Increase total heating surface Poor ut...

Страница 21: ...id solution or replace heating element Inadequate cylinder capacity Wait for heating loading of the cylinder You may check the specifications of the manufacturer conc cylinder capacity Long waiting ti...

Страница 22: ...tubes Automatic controls wrongly set Check that the controller has been cor rectly set see separate instructions Immersion sensor placed incorrectly Place immersion sensor correctly in ac cordance wi...

Страница 23: ...N 61000 6 1 2007 Electromagnetic compatibility Generic standard Immunity for residential commercial and light industry EN 61000 6 2 2005 Electromagnetic compatibility Generic standard Immunity industr...

Страница 24: ...o comply with all technical regulations and the applicable legislation in every respect Installation and commissioning must only be performed by trained authorised personnel The substation is checked...

Страница 25: ...25 25 Danfoss District Energy VI HE M1 02 DKDHR Instructions for installation and use VX Solo HWS substations...

Страница 26: ...26 DKDHR VI HE M1 02 Danfoss District Energy Instructions for installation and use VX Solo HWS substations...

Страница 27: ...27 27 Danfoss District Energy VI HE M1 02 DKDHR Instructions for installation and use VX Solo HWS substations...

Страница 28: ...uced by Danfoss Redan A S 04 2012 VI HE M1 02 Danfoss Randall Ltd District Energy Ampthill Road DK Bedford MK42 9ER Tel 0845 1217 400 Fax 0845 1217 515 danfossrandall danfoss com www danfoss randall c...

Отзывы: