![Danfoss VLT ISD 410 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/danfoss/vlt-isd-410/vlt-isd-410_operating-instructions-manual_3558780025.webp)
Connecting cables
1.
Connect the female connector of the feed cable
to the male connector of the first servomotor.
2.
To add additional servomotors, connect the male
connector of the loop cable to the female
connector of the first servomotor.
3.
Connect the female connector of the loop cable
to the male connector of the next servomotor,
and so on.
4.
Screw the terminating resistor onto the female
connector of the last servomotor.
5.
Turn the threaded rings hand tight.
6.
Check the cabling again for sufficient slack.
7.
Using the Danfoss installation tool, tighten the
threaded rings of the connectors.
Disconnecting cables
1.
Disconnect the power supply module from its
power source (mains network).
2.
Wait for the necessary discharge time to elapse.
3.
Loosen the connector of the feed cable from the
connection box.
4.
Loosen the threaded rings of the connectors. Use
the Danfoss installation tool for this purpose.
5.
Disconnect the hybrid cable (and the sensor
cable if present) from the servomotor.
5.6.3 Connecting/Disconnecting Sensor
Cables
Cable routing
1.
Provide sufficient slack for all cables. Especially
with regard to the range of motion of the
installed servomotor.
2.
Secure all cables in accordance with regulations
and depending on conditions on site. No cable
should come loose, even after prolonged
operation.
Connecting cables
1.
Connect the connectors in the right position.
2.
Turn the threaded rings hand tight. Use a
standard 13 mm open-end spanner for this
purpose.
Disconnecting cables
1.
Loosen the threaded ring of the connector (use
the 13 mm open-end spanner for this if
necessary).
2.
Disconnect the sensor cable from the servomotor.
Installation/Fitting
VLT
®
ISD 410 Servomotor Operating Instructions
24
MG75D102 - VLT
®
is a registered Danfoss trademark
5
5