Page
87
of
108
M-AP-001-EN Rev. N
Care should be exercised when selecting pipe sizes as they will vary according to their
application. Section 14, “Sample Refrigeration Circuits,” provides examples of compressor
piping arrangements for the most common applications.
The motor-cooling line should be channeled from the liquid line; refer to Section 13.3 for
more information. DTC requires the installation of a sight glass and full-flow liquid dryer in
the motor-cooling line.
NOTE
Some applications may require alternative arrangements. Contact DTC for further assistance, if required.
• • • CAUTION • • •
The discharge line must be fitted with a non-return valve to prevent reverse flow into the discharge port, which can cause
damage to compressor components.
All pipe work should be carried out in accordance with industry standards. Brazing without the use of nitrogen will result in
debris being deposited in the pipes, potentially leading to blockage or damage.
Discharge piping should contain a caution label from system manufacturers or compressor installers that the surface is hot.
Piping Considerations
17 Piping Considerations
Содержание TG230 Series
Страница 2: ...Page 2 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 8: ...Page 8 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 18: ...Page 18 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 32: ...Page 32 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 36: ...Page 36 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 44: ...Page 44 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 50: ...Page 50 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 52: ...Page 52 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 54: ...Page 54 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 56: ...Page 56 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 58: ...Page 58 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 70: ...Page 70 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 74: ...Page 74 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 77: ...Page 77 of 108 M AP 001 EN Rev N Physical Data 16 2 Center of Gravity Figure 16 4a Center of Gravity ...
Страница 81: ...Page 81 of 108 M AP 001 EN Rev N Physical Data Figure 16 8 Discharge Port Detail TT700 and TG520 Gas Flow ...
Страница 82: ...Page 82 of 108 M AP 001 EN Rev N Physical Data Figure 16 9 Suction Port All Models ...
Страница 88: ...Page 88 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 90: ...Page 90 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 92: ...Page 92 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 104: ...Page 104 of 108 M AP 001 EN Rev N Appendix A Power Line Accessories Installation Figure A 1 Line Reactor Connections ...