Installation Guide
Termix HD MIX Compact 28
6.2.2 Fitting piece
The substation is equipped with a fitting piece for energy meter.
Assembly of energy meters:
1: Close ball valves
Close the ball valves on DH Supply and DH Return, if there is water
on the system.
2: Loosen nuts
Loosen the nuts on the fitting piece.
3: Remove fitting piece
Remove the fitting piece and replace it with the energy meter. Do
not forget the gaskets.
4: Tighten connections
After mounting of the energy meter remember to check and
tighten all threaded connections.
Sensor pocket, energy meter
The sensors of the energy meter is mounted in the sensor pockets.
Danfoss District Energy
VI.GP.E1.02 / LUK42860
DEN-GT
13
Содержание Termix HD MIX Compact 28
Страница 17: ...Installation Guide Termix HD MIX Compact 28 Danfoss District Energy VI GP E1 02 LUK42860 DEN GT 17 ...
Страница 18: ...Installation Guide Termix HD MIX Compact 28 18 DEN GT VI GP E1 02 LUK42860 Danfoss District Energy ...
Страница 20: ...Installation Guide Termix HD MIX Compact 28 Produced by Danfoss A S 09 2013 ...