Note:
Entire compressor becomes very hot and under high pressure immediately after operation. Handle it with utmost care.
1. Stop the unit.
2. Connect the manual pump and the unit with a charging pressure hose (for CO2).
* Before connecting the pressure hose, confirm that the valve at the oil service port is closed.
3. Compress condensing unit oil with the manual pump. When the pressure becomes higher than the balance pressure, open the valve
at the oil service port, and charge the condensing unit oil.
4. After charging oil, close the valve at the oil service port, and remove the charging pressure hose (for CO2).
5. Operating the unit, check the oil level in the oil pod.
5.5 Replenishment of condensing unit oil after operation
5. System design recommendations
Fig. 25
Oil service port
38
AB408540130380en-000102
© Danfoss | Climate Solutions | 2023.02
Application Guidelines
Содержание Optyma OP-UPAC015COP04E
Страница 1: ...Optyma iCO2 condensing units R744 50 Hz Application guidelines www danfoss com...
Страница 2: ......