manualshive.com logo in svg
background image

Operating guide |MPE 70

7

180R9426 | AQ367027814446en-000801 | IOM  MPE 70 | 08.2022

3. Safety

3.1  General

The MPE 70 must not be used for other 

purposes than those recommended and 

specified without first consulting your local 

MPE 70 distributor.

This manual must be read and completely 

understood by the responsible specialist 

personnel prior to installation and commis-

sioning.

Use of this manual does not relieve opera-

tion and maintenance personnel of the 

responsibility of applying normal good 

judgment in the operation and care of this 

product and its components.

This manual must be available to all person-

nel concerned at the site at all time.

An MPE 70 must always be installed and 

used in accordance with existing national 

and local sanitary and safety regulations 

and laws. It is the responsibility of the safety 

officer or the chief operator to assure com-

pliance with all local regulations that are not 

taken into account in this manual.

The MPE 70 is a rotating machine that typi-

cally operates at high pressure. 

 

Always wear suitable safety and lifting 

 

equipment when handling the MPE 70.

 

• Bolt the MPE 70 properly to the frame 

 

  before start-up to avoid personal 

 

  injury and/or damage to the MPE 70. 

 

• The pipe connections to the MPE 70 

 

  must be stress-free mounted, securely 

 

  fastened to the MPE 70 and well 

 

  supported. Improper installation will 

 

  or could result in personal injury 

 

  and/or damage to the MPE 70.

 

• Proper installation and care of 

 

  shutdown devices and over-pressure 

 

  protection equipment is essential.

 

• All electrical installation work must be 

 

  carried out by authorised personnel in 

 

  accordance with EN60204-1 and/or 

 

  local regulations. 

 

• Install a lockable circuit breaker to 

 

  avoid inadvertent starting. Protect the 

 

  motor and other electrical equipment 

 

  from overloads with suitable 

 

 equipment.  

 

• The electric motors must be supplied 

 

  with adequate cooling ventilation.

 

• Improper installation can cause fatal 

 

 injuries. 

 

• The MPE 70 must not operate outside 

 

  the application range. 

 

• Make sure that the pressure is 

 

  released from the MPE 70 before the 

 

  MPE 70 is disconnected from any pipe 

 

 connections. 

 

• Before intervening in the 

 

  MPE 70/system, the power must be    

 

  shut off and the starting device must  

 

   be locked. When intervening in the    

 

  MPE 70 unit, follow the instructions    

 

  for Service/Maintenance, chapter 8. 

 

• A failure not to follow the instructions  

 

  can result in personal injury and/or 

 

  damage to the MPE 70.  It will also 

 

  invalidate the warranty.  

 

• The MPE 70 must never run dry. Dry 

 

  running produces heat and will cause 

 

  damage to internal parts. 

 

• If the MPE 70 does not function 

 

  satisfactorily, contact your local MPE   

 

  70 distributor.

 

Use of this manual does not relieve 

 

operation and maintenance personnel 

 

of the responsibility of applying normal  

 

good judgment in the operation and 

 

care of this product.

Содержание MPE 70

Страница 1: ...Operating guide Energy Recovery Device MPE 70 Installation Operation and Maintenance Manual hpp danfoss com...

Страница 2: ...by low pressure isolation 8 4 Arrival inspection handling and storage 9 4 1 Arrival inspection 9 4 2 Return to the supplier 9 4 3 Transport and Handling 9 4 4 Storage 10 5 Technical data and design d...

Страница 3: ...ing start up and shutdown 19 8 1 Safety regulations 19 8 2 Support 19 8 3 Commissioning 19 9 Service Maintenance 20 9 1 Safety regulations 20 9 2 Support 20 9 3 Maintenance schedule 20 9 4 Recommended...

Страница 4: ...greed All rights reserved Contents provided herein must neither be distributed copied reproduced edited or processed for any other purpose nor otherwise translated or published without Danfoss express...

Страница 5: ...hat these instructions are always readily available to all personnel concerned 2 2 Target group This manual is intended for use by personnel with qualified training and experience in the operation and...

Страница 6: ...ease contact Danfoss Document name Content Service guide MPE 70 Disassembling and assembling Description of how to disassemble and as semble the MPE 70 Guide line P and ID review sheet Detailed descri...

Страница 7: ...e MPE 70 and well supported Improper installation will or could result in personal injury and or damage to the MPE 70 Proper installation and care of shutdown devices and over pressure protection equi...

Страница 8: ...ief valves should be used or procedures should be implemented to safeguard the HP lines and instrumentations in the RO system The system designer is responsible to design the equipment according to th...

Страница 9: ...PE 70 with clean water Drain the MPE 70 and plug the port connections with a cap cover Pack the MPE 70 into a suitable container and make sure that it is suitably fastened to the container 4 3 Transpo...

Страница 10: ...DOWFROST from DOW Chemical Company or Chillsafe mono propylene glycol from Arco Chemical Company For further information on anti freeze me dia please contact Danfoss High Pressure Pumps The MPE 70 is...

Страница 11: ...l noise may affect the noise level from the MPE 70 system The sound level is therefor only given for the MPE 70 in cluding the MPE 70 motor The Sound pres sure level can be found in data sheet MPE 70...

Страница 12: ...a standardised mechanical seal 5 4 Temperature and corrosion The chart below illustrates the corrosive resistance of different types of stainless steel related to NaCl concentration and temperature De...

Страница 13: ...ecth showing the principle of MPE pressure exchange The MPE 70 rotor is rotated by an electric motor The rotor spins between two end covers Pressure energy is transferred directly from the high pressu...

Страница 14: ...essure indicator 6 Safety valve 7 Plug valve 8 Venting valve 9 Plug valve 10 Pressure indicator 11 MPE 70 12 Flowmeter 13 Fresh water permeate flush 14 Pressure indicator 15 Controll valve 16 Membrane...

Страница 15: ...pumps will be started first fol lowed by the MPE 70 and then the high pressure pumps always in that order The control valve Pos 15 will open slowly Control loop no 2 is activated to reach the setpoint...

Страница 16: ...e specification given in the data sheet appendix 11 1 to assure optimum service life A true graded density melt blown depth filter cartridge is recom mended Poor pre filtration of the feed water will...

Страница 17: ...s offers rail and bracket solu tion Danfoss offers rail and bracket solution for vertical installation The rail should be mounted on a steel frame The base frame itself must be aligned to avoid bendin...

Страница 18: ...shaft on the electric motor Ignorance will or could result in personal injury Running the MPE 70 in the wrong direction for more than a few minutes can cause un intended wear on the MPE 70 If the ele...

Страница 19: ...urer s location Rated quotes are offered upon request 8 3 Commissioning Before starting up the MPE 70 and the high pressure pump make sure the following requirements are met Slowly raise the pressure...

Страница 20: ...n the bolts to specified torque if necessary 2 Visually inspect all pipe con nections couplings for external leakage 3 Re check bolts in all pipe con nections couplings and tighten the bolts to specif...

Страница 21: ...wear and should therefore be taken into account For more information please contact Danfoss High Pressure Pumps Se below table For detailed information see parts list for MPE 70 in appendix 11 4 9 5 R...

Страница 22: ...art torque Ramp up settings in the VFD are not correct VFD is tilting Set ramp up parameters correct Torque on MPE 70 is too high during operation Debris in the MPE 70 Clean the system Wear in the MPE...

Страница 23: ...Appendices Energy Recovery Device MPE 70 Installation Operation and Maintenance Manual hpp danfoss com...

Страница 24: ...endices 11 Appendices 23 11 1 Data sheet MPE 70 AI358154451639en 000401 25 11 2 Instruction AN362429033229en 000201 39 11 3 Design guide Pipe connections 180R9367 51 11 4 MPE 70 part list AX3618397520...

Страница 25: ...Data sheet Energy Recovery Device MPE 70 hpp danfoss com...

Страница 26: ...5 1 MPE flow curves 30 5 2 Mixing curve 31 6 Temperature and corrosion 32 6 1 Operation 32 7 Installation 32 7 1 Operation and mounting 32 7 2 Mounting MPE to motor 33 7 3 Connection to system 33 7 4...

Страница 27: ...70 design ensures lubrication of all moving parts by the fluid itself All parts included in the MPE 70 are designed to provide long service life with a constant high effi ciency and minimum service re...

Страница 28: ...ut barg 0 74 0 74 psig 10 73 10 73 Max static test pressure HP in and HP out barg 108 108 psig 1566 1566 Max static test pressure LP in and LP out barg 13 13 psig 189 189 Speed Min speed rpm 625 625 M...

Страница 29: ...ure it can provide the start current required 6 Efficiency measured at 70 m3 h balanced flow 60 bar g on HP out Power consumption of Motor and Variable Frequency Drive included 7 Dependent on NaCI con...

Страница 30: ...red flow For detailed overview please use the MPE selection tool The MPE 70 is delivered with a 3 1 performance certificate according to EN10204 5 Performance curves 5 1 MPE flow curves 198 218 238 25...

Страница 31: ...E 70 08 2022 5 2 Mixing curve 0 0 2 0 4 0 6 0 8 0 10 0 12 0 14 0 10 5 0 5 10 Volumetric mixing Flush ratio larger than 0 means overflush Volumetric mixing versus flushing The curve below shows the mix...

Страница 32: ...h fresh water at operation stop in order to minimize the risk of crevice corrosion 6 Temperature and corrosion 7 Installation The MPE 70 is build for vertical installation The MPE 70 is connected to t...

Страница 33: ...U Flow design and Z flow design MPE 70 MPE 70 MPE 70 Z Flow MPE 70 MPE 70 MPE 70 U Flow 7 6 Noise High quality water extends the service life of the whole system Water to the MPE 70 must be filtered t...

Страница 34: ...lock function or an automatic controlled valve G Variable speed and overload protection Install a VFD to control the speed of the MPE 70 The speed is defined by HP flow given by the flowmeter 29 H Mem...

Страница 35: ...hat will exceed mechanical strength of the membrane housing pipes and other accessories When using Danfoss APP pumps with Danfoss VCM check valves it is recom mended to place a pressure relief valve o...

Страница 36: ...Data sheet MPE 70 Energy recovery device 36 180R9426 AQ367027814446en 000801 IOM MPE 70 08 2022 8 1 MPE 70 without electric motor 8 Dimensions and connections...

Страница 37: ...Data sheet MPE 70 Energy recovery device 37 180R9426 AQ367027814446en 000801 IOM MPE 70 08 2022 8 2 MPE 70 with IE3 motor 2 2 kW on base frame vertical front mounted...

Страница 38: ...6651348409en 000501 38 9 Accessories Description Type Code no MPE 70 coupling kit 180Z4110 MPE 70 coupling 180Z4106 Bracket for 1 MPE 70 180Z4107 2 m rail without bracket 180Z4108 Electrical motor IEC...

Страница 39: ...ro solutions com Instruction APP pump instruction APP 0 6 1 0 APP 1 5 2 5 and APP 3 0 3 5 Instruction Energy recovery device MPE 70 Installation instructions hpp danfoss com...

Страница 40: ...n 43 4 Assembling MPE 70 to electric motor 44 4 1 Installing support feet 44 4 2 Bell housing and coupling 44 4 3 Installing coupling and bell housing 45 5 Orientation 46 6 Danfoss bracket and rail sy...

Страница 41: ...1 mm Screwdriver small Nylon Hammer Wrench 10 mm Wrench 30mm Hex socket 6 mm 3 8 Hex Socket 10 mm 3 8 Hex Socket 30 mm Socket 17mm 3 8 Allen key 2 5mm Allen hex head 5mm 3 8 Allen hex head 8mm 3 8 2 x...

Страница 42: ...uipment Be aware of indi viduals located in the operation area while lifting the component The weight of the MPE 70 including electric mo tor can be found in the datasheet Use suitable lifting devices...

Страница 43: ...on a wooden board Keep plastic caps on until MPE 70 is installed to the base frame 3 2 Lifting unit into vertical position Use jacking beam not supplied by Danfoss and two slings connected to the two...

Страница 44: ...led on the rail the MPE 70 is positioned vertically by installing the four support feet from the tool set Tighten the bolts with 30 Nm 4 2 Bell housing and coupling The MPE 70 is connected to the elec...

Страница 45: ...shaft 5 Measure from motor flange to the top of the coupling That measurement B shall be 3 5 mm 0 12 0 2 inch shorter the measurement A If alternative mounting is required please con tact Danfoss for...

Страница 46: ...ss recommends M12 bolts A4 80 Bolt tightening torque acc to recommendation from the bolt supplier Make sure that the bolts are properly locked and will stay locked over time 6 Danfoss bracket and rail...

Страница 47: ...commends a minimum distance of 400 mm between the MPE s 6 2 Bracket The bracket supplied by Danfoss consists of 1 Main bracket 2 Bottom piece loosely mounted to the bracket 3 8 x M10 bolts in plastic...

Страница 48: ...7 Flexible Coupling Spool pieces must be manufactured according to the Victaulic OGS cut groove specifications or similar To allow for inaccuracies in the manifolds and to ensure an easy installation...

Страница 49: ...the rail Allow for some play Hand tighten the screws on the bottom bracket to allow for adjust ment during alignment 8 1 Installing the MPE 70 on the rail The rail and MPE 70 must be aligned with the...

Страница 50: ...anic corrosion MPE 70 skid should be properly grounded All parts in the system must be electrical potential equalized to a single reference point grounding point It is recommended that the electrical...

Страница 51: ...it is preferred to use flexible hoses or a minimum of 2 flexible couplings combined on the same pipe When using hard piping it is important to allow a gap between each individual Victaulic connection...

Страница 52: ...at the same joint 3 End Loads are total from all internal and external loads based on duplex stainless steel pipe Pipe support Flexible coupling Styles 77 and others standard grooved type couplings al...

Страница 53: ...Parts list Energy recovery device MPE 70 hpp danfoss com...

Страница 54: ...00801 IOM MPE 70 Table of Contents 1 General The parts list provides an overview of the content of the various service kits for the MPE 70 as well as exploded view of the MPE 70 Table of Contents 1 Ge...

Страница 55: ...I 316 X 121 1 3 VIC Connector HP IN Super Dubles 122 4 Screw M8 x 20 CS RS A4 80 AISI 316 X 123 1 3 Vic connector LP Out Super Dublex 124 2 Lifting eye M12 AISI 316 125 3 O ring 11 0X2 0 NBR X 126 3 B...

Страница 56: ...Parts list MPE 70 56 Danfoss DCS im 2022 08 180R9426 AQ367027814446en 000801 IOM MPE 70 3 Exploded view MPE 70...

Страница 57: ...8 length 250 mm X 2 Screwdriver 5 5 x 1 mm X 1 Screwdriver small X 1 Nylon Hammer X 1 Wrench 10 mm X 1 Wrench 30 mm X 1 Hex socket 6 mm 3 8 X 1 Hex socket 10 mm 3 8 X 1 Hex socket 30 mm X 1 Socket 17...

Страница 58: ...Danfoss DCS im 2022 08 AX367028596447en 000301 58...

Страница 59: ...M a n u a l Electric Motors Motor Manual hoyermotors com...

Страница 60: ...hat the mounting conditions do not cause resonance with the rotational frequency and the doubled supply frequency Only mount or remove drive components pulley coupling etc using suitable tools never h...

Страница 61: ...lues The table values are based on an ambient temperature of 25 C The values must be halved for every 15K increase in bearing temperature Higher speed operations e g frequency converter drive will req...

Страница 62: ...62 180R9426 AQ367027814446en 000801 IOM MPE 70 08 2022 Connection diagram Anschlu diagram Anslutningdiagramm Forbindelsesdiagram Aansluitdiagram Connection Conexi n Collegamento Schemat polacsen...

Страница 63: ...63 180R9426 AQ367027814446en 000801 IOM MPE 70 08 2022...

Страница 64: ...d hoist hook into eyebolt underneath For vertical mounted motors the use of a spreader beam is recommended for maintaining the lifting element chain or rope in vertical position and thus preventing da...

Отзывы: