4. Arrival inspection,
handling and storage
4.1 Arrival inspection
The MPE 70 is packed in a wooden box. The
MPE 70 ports connector are protected by
plastic caps that protect the MPE 70 against
dust and particles. Do not remove the caps
before the system have been flushed and
the MPE 70 can be installed.
Remove all packing materials immediately
after delivery. Immediately check the
shipment for damage on arrival and make
sure that the name plate/type designation is
in accordance with the packing slip and your
order.
In case of damage and/or missing parts, a
report should be drawn up and presented
to the carrier at once.
The identification label on the MPE 70 states
the specific type, the serial number and the
code number of the MPE 70; see fig. below.
The last three digits of the Serial No. indicate
the week and year of production.
4.2 Return to the supplier
Flush the MPE 70 with clean water. Drain the
MPE 70 and plug the port connections with a
cap/cover.
Pack the MPE 70 into a suitable container
and make sure that it is suitably fastened to
the container.
4.3 Transport and Handling
• Personnel involved in lifting and
transportation of the equipment must be
trained in proper handling and safety
procedures.
• Observe the local regulations regarding
lifting.
• Use suitable, permitted lifting equipment.
• Be aware of individuals located in the
operation area while lifting the
component.
The weight of the MPE 70 including electric
motor can be found in the data sheet.
All parts weighing more than 20 kg (44 lb)
must be lifted using lifting slings and suit-
able lifting devices, e.g. an overhead crane
or fork lift.
Do not use connections/nozzles for lifting.
Do not use only one sling! Make sure that
the load is balanced before attempting the
lift.
ERD
Type MPE 70
Code no. 180F7070
Serial no. XXXXXX01-XXX
MADE IN DENMARK
Danfoss A/S, 6430 Nordborg, Denmark
Please coordinate the shipment with your
local authorized distributor or contact
Danfoss direct to obtain a return shipping
address.
When lifting the ERD use the lifting eyes.
Содержание MPE 70
Страница 23: ...Appendices Energy Recovery Device MPE 70 Installation Operation and Maintenance Manual hpp danfoss com...
Страница 25: ...Data sheet Energy Recovery Device MPE 70 hpp danfoss com...
Страница 53: ...Parts list Energy recovery device MPE 70 hpp danfoss com...
Страница 56: ...Parts list MPE 70 56 Danfoss DCS im 2022 08 180R9426 AQ367027814446en 000801 IOM MPE 70 3 Exploded view MPE 70...
Страница 58: ...Danfoss DCS im 2022 08 AX367028596447en 000301 58...
Страница 59: ...M a n u a l Electric Motors Motor Manual hoyermotors com...
Страница 63: ...63 180R9426 AQ367027814446en 000801 IOM MPE 70 08 2022...