Installation Guide Danfoss Link™ CC
15
Danfoss Heating Solutions
VISGL90N
12/2014
GB
4 . Installation
Danfoss Link™ CC can be installed
with either a PSU (in-wall power
supply) or a NSU (net power supply).
!
Do not
install in
bathrooms
Avoid direct
sunlight
140-170 cm
Installation
height
Installing Danfoss Link™ CC with In-Wall PSU
UP
PSU
• Hold the PSU over the wall box and mark up the 4 screw holes.
Make sure the top is level.
• Drill holes and put fitting plugs in.
• Connect the PSU according to the connection diagram on the
back side.
• Mount the PSU with the 4 screws.
Installing Danfoss Link™ CC with NSU
UP
NSU
• Hold the mounting plate on the wall and mark up the 4
screw holes. Make sure the top is level.
• Drill holes and put fitting plugs in.
• Mount the mounting plate with the 4 screws.
Do not
mount the Danfoss Link™ CC yet!
• Connect the NSU to a power outlet.
Содержание Link CC
Страница 1: ...Danfoss Link CC Central Controller Installation Guide www danfoss com...
Страница 2: ...Installation Guide Danfoss Link CC 2 Danfoss Heating Solutions VISGL90N 12 2014...
Страница 4: ...Installation Guide Danfoss Link CC 4 12 2014 VISGL90N Danfoss Heating Solutions...
Страница 38: ...Installation Guide Danfoss Link CC 38 12 2014 VISGL90N Danfoss Heating Solutions 10 Disposal instructions...