Electric machine weekly maintenance checklist (continued)
N.A
PASS
FAIL
Functioning of the cooling system in
general
☐
☐
☐
Notes:
•
•
•
•
•
•
•
•
•
•
•
•
Electric machine monthly maintenance checklist
Date:
Electric machine and customer information
Customer:
Electric machine type (from the rating plate):
Customer reference:
Electric machine serial number:
Service reference:
Date installed:
N.A = Procedure not applicable PASS = Procedure passed FAIL = Procedure failed
Electric machine monthly maintenance checklist
N.A
PASS
FAIL
General construction
Noise or vibration during operation
in general
☐
☐
☐
Cleanliness of the enclosure and
connected parts
☐
☐
☐
Electrical system
Weariness of the cables
☐
☐
☐
Insulation resistance
(If the electric machine is in
continuous use, it is recommended
to do the insulation resistance test
every three or four months.)
☐
☐
☐
Encoder mounting
☐
☐
☐
Cooling system
Functioning of the cooling system in
general
☐
☐
☐
Tightness of the ventilation plug
☐
☐
☐
User Guide
EM-PMI540-T4000
Storage, installation and maintenance checklists
©
Danfoss | April 2023
BC265857716810en-000202 | 67