User Gu
•
Carr
2.4.3
Unpa
•
Plac
the
•
Cut
•
Rem
the
•
Bot
bett
the
•
Rem
out
•
The
•
Sto
reus
After
2.4.4
•
DLX
•
Mou
•
Inst
•
Acc
2.4.5
The h
•
NEM
•
Prov
wat
•
Be u
uide
DLX UL series
ry the inverte
Unpa
.
ck the invert
ce the box in
packaging.
the seal, and
move the upp
envelope wi
h sides of the
ter grip on th
box using th
move the low
the inverter
e bag with acc
re all the orig
se.
unpacking th
Scope
.
X UL
single ph
unting brack
tallation Guid
essories: gro
NOTIC
Conduit
and mu
Invert
.
housing of the
MA 3R for ind
vide a degree
ter, hose-dire
undamaged b
L00410625-01
er close to the
cking
er as follows:
position, wit
d open the bo
per part of the
th the extra p
e inverter cas
he inverter. Li
he “handles” a
wer section of
mounting br
cessories is a
ginal packing
he inverter, c
e of Deliv
hase inverter
et
de
unding strap
CE
ts, fittings an
ust be provide
ter Enclo
e
DLX UL
inve
door or outdo
e of protectio
ected water a
by the extern
e body.
:
th the top cle
ox.
e foam packi
product labe
se are narrow
ift the inverte
as illustrated
f the foam pa
racket.
ttached to th
material for
heck that all
very
r
p, bracket scre
nd bonding st
ed by the sys
osure
erter series is
oor use.
on from fallin
nd corrosion
nal formation
early visible a
ng material a
l.
wed in order t
er carefully ou
in
Figure 2.3
.
ckaging and
he bracket.
possible late
components
ews, extra pro
traps are not
stem installer
s designed to
ng dirt, rain, s
.
n of ice on the
nd according
and take out
o get a
ut of
.
take
er
Figu
s are included
oduct label
part of the st
r.
o:
leet, snow, w
e housing.
g to the arrow
the
Installati
ure 2.3: “Handles
d and undam
tandard scop
windblown du
1
w markings o
ion Guide
and
”
maged.
pe of supply,
ust, splashing
1
on
d
g