User Gu
4.3.2
The
D
•
The
and
•
The
spe
Figur
•
Use
the
•
Pos
•
Dril
•
Care
Listed
String
uide
DLX UL series
2.1.
Cond
DLX UL
Stringb
e Stringbox co
d shipped wit
e knock outs a
cified in the f
e 4.7: Knock outs
e a 1” hole saw
knock outs f
ition the hole
l through the
efully file dow
NOTIC
For con
the enc
Conduit
•
DC
co
•
AC
co
•
Netw
d conduit fitti
gbox knock o
L00410625-01
duits
box is equipp
onnected to t
th knock outs
are located o
figure below
s on the Stringbo
w to remove
for the 1” fitti
e saw in the m
e cover.
wn any rough
CE
duit hubs, us
closure
ts are connec
onduits are m
onduits are m
work
conduits
ings that fulf
outs:
ped with kno
the bottom o
s for ¾” and 1
n the left and
.
ox
the knock ou
ngs.
middle of the
h edges.
se only UL Lis
cted to the St
mounted on th
mounted on th
s are mounte
ill the followi
ock-outs to fit
of the inverte
” conduit fitt
d right sides,
Figure
uts for the ¾”
e knock out fa
sted raintight
tringbox as fo
he
bottom
o
he
right side
d on the
left
ing criteria sh
t the conduit
er is made of
tings.
bottom and
e 4.8: Removal of
” fittings and
ace.
t, or wet loca
ollows:
of the Stringb
e
of the String
t side
of the S
hould be used
fittings.
non-conduct
back of the S
f the knock outs
1-
5
/
16
” hole s
tion, hubs fo
box.
gbox.
Stringbox.
d for the
DLX
2
tive material
Stringbox as
saw to remov
or entry into
X HE- t UL
7
ve