Please observe that AKS 4100/4100U  

   

is intended to always be installed in  

   

a standpipe (column/bypass/stilling  

   

well). A Standpipe is commonly used 

when:

•  Servicing the AKS 4100

•  There is highly conductive foam in the  

 tank.

•  The liquid is very turbulent or agitated.

Refrigerants

AKS 4100/4100U is designed specifically to 

measure liquid level in the most commonly 

used refrigerants, including R717(ammonia), 

HCFC, HFC and non corrosive gases/liquids.
AKS 4100/4100U can also be used with R744 

(CO

2

) in the coaxial version. Please see the 

technical brochure for further details.  

Basic data

 

AKS 4100/4100U is a passive 2-wired 4-20 mA 

sensor that is loop powered.

Supply Voltage

14-30 V d.c. Min/Max. value for a max. output 

of 22 mA at the terminal

Load

RL [Ω] ≤ ((Uext -14 V)/20 mA).  

– Default (Error output set to 3.6 mA)

RL [Ω] ≤ ((Uext -14 V)/22 mA).  

– (Error output set to 22 mA)

Cable gland

AKS 4100 

PG 13, M20×1.5 ;  

 

  (cable 

diameter: 

 

   

 

6-8 mm (0.24-0.31in.)

AKS 4100U  ½ in. NPT

Terminals (spring loaded)

0.5-1.5 mm

2

 (~20-15 AWG)

Enclosure

IP 67 (~NEMA type 4X)

Refrigerant temperature

–60°C/100°C (–76°F/212°F)

Refrigerants

The listed refrigerants are qualified and 

approved by Danfoss:

R717 / NH

3

:  –40°C / +50°C (–40°F / +122°F)

R744 / CO

2

:  –50°C / +15°C (–58°F / +59°F)

HCFC:

R22:  

–50°C / +48°C (–58°F / +118°F)

HFC:

R404A:  

–50°C/ +15°C (–58°F / +59°F)

R410A:  

–50°C /+15°C (–58°F / +59°F)

R134A  

–40°C /+50°C (–40°F /+122°F)

(Further details in the Technical Brochure)
Ambient temperature

–40°C / +80°C (–40°F / +175°F) 

For HMI : –20°C / +60°C (–4°F / +140°F) 

Process pressure

–1 barg / 100 barg (–14.5 psig / 1450 psig)
Mechanical process connection with 5 m (197 

in.) Ø2 mm (0.08 in.) stainless cable:

AKS 4100 

G1 inch pipe thread.  

 

   

 

Aluminium gasket included

AKS 4100U  ¾ in. NPT

(Further details in the Technical Brochure)

Mechanical Installation

Preparations prior to Mechanical Installation

Disassemble the Signal Converter from the 

Mechanical process connection (use 5´mm 

hex key, 

see fig. 6

). Fit the red protection 

cover on top of the Mechanical process 

connection to protect it againt any moisture 

or dirt paticles. 

Content supplied (fig. 1)

 

Signal Converter (with or without HMI)

 

Mechanical process connection with  

 

5 m (197 in.) Ø2 mm (0.08 in.) stainless wire

 

Counterweight

 

Accessory bag comprising: 

 

3 mm set screws. 

 

Red cover to protect mechanical process  

 connection 

 prior to mounting Signal  

 converter.

 

Setting label.

Note:

If standpipe diameter differs in width 

(fig. 

2b)

 the Cable version is not recommended. 

Coaxial version should be used.

Adjustment of the counterweight blades

Allow 5 mm space between the guided blades 

and the inner wall of the pipe 

(see fig. 2c)

. Use 

side cutters to trim the guided blades to fit the 

actual standpipe diameter 

(see fig. 3)

.

Adjustment of the cable probe

   

Please observe that the stainless

   

steel wire is not permanently creased  

   

or kinked. 

Always use the reference point, at the 

Mechanical Process Connection (see fig. 

4)

, as a starting point for all measuring to 

determine: 

•   Where to cut the cable.

•   Probe length 

(see fig. 5)

•   Scale 4 mA 

(see fig. 5)

•   Scale 20 mA 

(see fig. 5)

Note the probe length, Scale 4 mA and Scale 

20 mA for use later when programming the 

HMI (Human Machine Interface) on the AKS 

4100/4100U.
Follow these instructions and 

see fig. 4 & 5

:

1.  Measure the inner length of the Standpipe.
2.  

Preparation before cutting the cable

  Known data:

  Space below counterweight:  20 mm (0.8 in.)

  Steel wire insertion length in  

 

  counterweight: 12 mm (0.5 in.)

  counterweight height: 33 mm (1.3 in.)

  Max Probe length =

  Standpipe inner length 

–  Space below counterweight 

  (20 mm (0.8 in.))

 

The cable length =

  Max probe length 

+  Steel wire insertion

  length in counterweight (12 mm (0.5 in.))  

–  Counterweight height (33 mm (1.3 in.))

3.  Measure out the cutting point of the cable.  

  Measure from the reference point 

(fig. 4)

  

  and cut the cable
4.  Fit the counterweight on the cable and  

  secure the two set screws with a 3 mm Allen  

 Key 

(fig. 3)

.

5.  Lower the counterweight down through  

  the threaded hole. 

Make sure that the  

  counterweight is gliding down through  

  the pipe without any resistance and  

  that the cable is straight (not touching  

  the inner walls of the stand pibe or any  

  incoming piping (see fig. 2a)).

 

6.  Use a torque wrench to tighten the    

  mechanical process connection  

 

(fig. 1, item 2)

 to 120 Nm (89 lb/ft).

Calculating the measuring range

4 mA 

setting for max. measuring range:

  =  Max probe length 

–  Counterweight height (33 mm (1.3 in.))

–  Bottom dead zone (see fig. 5)

20 mA

 setting for max. measuring range:

= Top dead zone (see fig. 5)

 

Example

Known data:

Space below counterweight:  20 mm (0.8 in.)

Steel wire insertion length in   

counterweight: 12 mm (0.5 in.)

counterweight height: 33 mm (1.3 in.)

Preconditions:

 

Factory setting is used

Refrigerant = Ammonia

Standpipe inner length = 3100 mm (122 in.)

Max probe length =  

3100 mm – 20 mm = 3080 mm

(122 in. – 0.8 in. = 121.3 in.)
The cable length:

  Max probe length =  

+  Steel wire insertion length in  

 

  counterweight (12 mm (0.5 in.))  

–  Counterweight height (33 mm (1.3 in.))

  3080 mm + 12 mm – 33 mm = 

3059 mm

 (

121.3 in. + 0.5 in. – 1.3 in. = 

120.4 in.)

4 mA

 Setting for Max. Measuring Range:

  Max probe length (3080 mm (121.3 in.))

–  Counterweight height (33 mm (1.3 in.))

–  Bottom dead zone (see fig. 5) 

  (210 mm (8.3 in.)) = 

2837 mm (111.7 in.)

20 mA

 Setting for Max. Measuring Range:

= Top dead zone (see fig. 5) = 120 mm (4.7 in.) 

How to mount the AKS 4100/4100U 

Converter (see fig 6) 

1.  Unscrew the set screw with a 5 mm    

  Hexagon key in the Signal converter.
2.  Push the Signal Converter downwards to  

  stop on the Mechanical process  

 

 connection
3.  Turn the Signal Converter to the wanted 

  position and tighten the set screw with a  

  5 mm Hexagon key

Electrical installation/connection

Output terminals (fig. 7 and 8):

1.  Current output –

2.  Current

3.  Grounding terminal 

Electrical installation procedure  

1.  Use a 2.5 mm Allen wrench to loosen the  

  cover stop.

2.  Remove the terminal compartment cover  

  from the housing.

3.  Do not disconnect the wire from the  

  terminal compartment cover.  

 

  Put the terminal compartment cover  

  adjacent to the housing.

4.  Connect the wires to the device.  

  Tighten the cable entry glands.

5.  Attach the terminal compartment cover  

  to the housing.

6.  Use a 2.5 mm Allen wrench to tighten the  

  cover stop.

Start up:

•   Connect the converter to the power supply.

•   Energize the converter.

Devices with the HMI display option only: 

After 10 seconds the screen will display 

"Starting up". After 20 seconds the screen will 

display the software version numbers. After 

30 seconds the default screen 

(fig. 12)

 will 

appear.

Precausions when changing from 

AKS 41/41U to AKS 4100/4100U
Note:

AKS 41/41U supports both a.c. and d.c. supply 

whereas the AKS 4100/4100U is using d.c. 

supply only.  

Follow the instructions in fig. 9.

Connecting to controller or PLC

Follow the instructions in 

fig. 10 or 11

  

Note:

   

The current output will be set to 3.6 mA  

   

whenever the AKS 4100/4100 detects  

   

an error like: "Level lost", "Overfill error" or

   

"Reference pulse lost".

Quick Setup 

Содержание AKS 4100

Страница 1: ...7 0 m m 2 7 6 i n 2 i n p i p e 4 5 m m 1 7 7 i n Standpipe Columm 2 in pipe 3 in pipe 4 in pipe Inner diameter 52 mm 2 05 in 78 mm 3 07 in 102 mm 4 02 in Total length of guided blades after cutting 4...

Страница 2: ...ge Bottom dead zone mm in mm in Ammonia HFC HCFC 800 31 5 115 4 2 801 999 31 5 39 120 4 7 1000 1999 39 79 150 5 9 2000 2999 79 118 180 7 1 3000 3999 118 157 210 8 3 4000 5000 157 197 240 9 4 Improved...

Страница 3: ...U AKS 41 41U with a c supply to AKS 4100 4100U with d c supply Danfoss EKC 347 or PLC 24V a c L 24V a c N AKS 41 41U 4 20 mA Danfoss EKC 347 or PLC 24V d c 24V d c AKS 4100 4100U Danfoss M84H0018_1 24...

Страница 4: ...o DISTANCE the displayed value will be the distance from the Reference point to the top surface of the liquid refrige rant see fig 5 LEVEL is display option If the display is set to LEVEL then the val...

Страница 5: ...data Spacebelowcounterweight 20mm 0 8in Steel wire insertion length in counterweight 12 mm 0 5 in counterweight height 33 mm 1 3 in Max Probe length Standpipe inner length Space below counterweight 2...

Страница 6: ...S 4100 1 0 0 STORE NO AKS 4100 DISTANCE 5000 mm Press to confirm Press or to select either STORE NO or STORE YES Press to confirm Default screen appears Quick Setup completed You have the possibility...

Страница 7: ...40 0 0 1 01 17 5 1 23 1 02 4 4 24 39 1 03 5 12 40 54 1 04 13 18 55 64 1 05 19 24 65 75 1 06 25 28 76 82 1 07 29 33 83 91 1 08 34 37 92 99 1 09 38 40 100 104 1 10 41 44 105 111 1 11 45 47 112 117 1 12...

Страница 8: ...0 DISTANCE 5000 mm AKS 4100 1 0 0 QUICK START AKS 4100 2 0 0 SUPERVISOR AKS 4100 2 0 0 __________ AKS 4100 2 1 0 INFORMATION AKS 4100 DISTANCE 5000 mm Enter password Press 6 times Press Press Press or...

Отзывы: