AK-PC 781
Capacity
controller RS8GG602 © Danfoss 2015-03
123
The reference for the receiver pres-
sure is set in relative bar.
(The “IT comp. state” read-out is the
signal received from the IT control-
ler.)
Settings in MT controller
Settings in IT controller
Initiates coordination with the IT
controller.
- Relay output, which emits signals.
- DI input, which receives signals
when the IT compressor is running.
The receiver pressure, Prec, must be
connected to the Po input on the IT
controller.
Select suction group
Select LT
Select IT compressor
From where the coordination with
the MT controller is initiated.
- DI input, which receives signals
when the IT compressor is to begin.
- Relay output, which emits signals
when the compressor is running.
The Vrec valve’s opening degree
when the parallel compression is to
start.
The start signal is first emitted when
the opening degree is higher during
the entire delay period.
The function will not come into ef-
fect if Sgc detects a temperature that
is lower than the set value.
Signal from MT
Signal to MT
The reference in the IT controller is
set in °C.
(The receiver pressure is set in rela-
tive bar.)
Receiver pres-
sure
[bar relativ]
Po Ref
[°C]
34
0
35
1
36
2
37
3
38
4
39
5
40
6
41
7
42
8
Содержание ADAP-KOOL AK-PC 781
Страница 31: ...AK PC 781 Capacity controller RS8GG602 Danfoss 2015 03 31 ...
Страница 41: ...AK PC 781 Capacity controller RS8GG602 Danfoss 2015 03 41 Example continued ...
Страница 44: ...44 Capacity controller RS8GG602 Danfoss 2015 03 AK PC 781 ...
Страница 135: ...AK PC 781 Capacity controller RS8GG602 Danfoss 2015 03 135 ...