Arrays and assembly procedures
4.3 XSL-SUB column
4.3.1 Remarks and limitations
NOTICE!
In connection with the Z5779 XSL-SUB Mounting frame, a
maximum of 7 x XSL-SUB cabinets can be flown.
4.3.2 Order of assembly
1. Attach the Mounting frame to the first SUB cabinet
To attach the frame to the first cabinet, proceed as follows:
1. Prepare the Front and Rear links of the first cabinet as
described in
Chapter 2.4 "Rigging mechanism of the
2. Attach the frame onto the cabinet until the Front links of the
cabinet fit into the slots at the front of the frame.
3. Insert the Locking pins on both sides.
4. At the rear, insert both Locking pins.
2. Suspend the assembly
1. Suspend the assembly according to your onsite requirements.
2. Lift the assembly to a suitable working height.
3. Add further SUB cabinets
1. Prepare the Front and Rear links of the next cabinet as
described in
Chapter 2.4 "Rigging mechanism of the
2. Position the next SUB cabinet below the assembly.
3. Lower the assembly onto the cabinet until the Front links of the
next cabinet fit into the slots on the front rigging strands of the
upper cabinet and the Rear link of the upper cabinet fits into
the rear rigging strand of the bottom cabinet.
4. At the front, insert the Locking pins of the cabinet's front rigging
strands on both sides.
5. On the bottom cabinet, check the Rear link is properly fitted
into the rear rigging strand.
6. Insert both Locking pins.
d&b Z5778/Z5779 Rigging manual 1.2 en
20