Arrays and assembly procedures
3. With the front grill facing upwards, attach the prepared next
cabinet to the corresponding slots at the front of the upper
cabinet.
4. Insert the Locking pin to the upper cabinet's front rigging
strands on both sides.
5. Raise the bottom cabinet until the Splay link of the upper
cabinet has engaged into the preset Locking pin (e.g.
[2°]) of
the bottom cabinet.
6. Insert the second Locking pin (Safety pin
[S]).
To add further cabinets, proceed in the same manner until the
assembly is completed.
4. Check the assembly
Before hoisting the array to its operating position, recheck the
actual status of the entire assembly according to the check list
given in
Chapter 5 "Rechecking, hoisting and secondary safety"
5. Rig the cabling
Connect the cables and link cables according to the number of
amplifier channels and cabinets used.
▪ If the amplifiers are already wired and powered on, use their
System check functions or Channel mute switches and a test
signal to check the correct operation and routing of all channels
and cabinets.
▪ Alternatively, check the wiring using the Array verification
function in R1.
d&b Z5778/Z5779 Rigging manual 1.2 en
19