Assembly

5. Raise the bottom cabinet until the hook of the Splay link of the

upper cabinet has hooked into the preset Locking pin.

6. Release the cabinet and insert the second Locking pin (Safety

pin) to secure the Splay link.

To add further cabinets, proceed in the same manner until the

assembly is completed.

6. Splay link of the last cabinet
The Splay link of the last cabinet can be kept in its park position.

Note: In this case, the lowest cabinet can be set to the

following splay angles: 3°, 5° and 7° to 14°.

7. Rig the cabling
Connect the flying cables and link cables according to the number

of amplifier channels and cabinets used.

8. Check the assembly
Before hoisting the array to its operating position recheck the

actual status of the entire assembly.
▪ Check the attachment of the shackles or Rota clamp to the

Flying adapter.

▪ Check the attachment of the Flying adapter to the first cabinet

and ensure all Locking pins are properly inserted and locked.

▪ Check all Front links on both sides of the cabinets and ensure all

Locking pins are properly inserted and locked.

▪ Check the splay angle settings and the Splay links on the rear of

the cabinets and ensure all Locking pins are properly inserted

and locked.

▪ In "Single pick point operation" check the desired total vertical

aiming of the entire array using an inclinometer.

2.4  Hoisting and securing the array (secondary
safety)
When all the mechanical adjustments, system checks and safety

checks have been made, the array can be hoisted up to its

operating position.
When hoisting the array, ensure that the loudspeaker cables do

not get caught anywhere. The cables can be strapped together

with the motor cable to form a loom while the system is hoisted.
The chain hoist motors must raise the system slowly and evenly so

that it does not swing or move from side to side during hoisting.
When the array is in its final operating position the 

secondary

safety must be applied.

 

d&b Z5394 Rigging manual 1.2 en

8

Содержание Z5394

Страница 1: ...Y Z5394 Rigging manual 1 2 en ...

Страница 2: ...d b website for the latest version of this document When reselling this product hand over this document to the new owner If you supply d b products please draw the attention of your customers to this document Enclose the relevant documents with the systems If you require additional documents for this purpose you can order them from d b d b audiotechnik GmbH Co KG Eugen Adolff Str 134 D 71522 Backn...

Страница 3: ...Assembly 5 2 1 Suspension options 5 2 2 Preparing the setup 5 2 3 Order of assembly 6 2 4 Hoisting and securing the array secondary safety 8 3 Care and maintenance 9 3 1 Transport Storing 9 3 2 Visual and functional inspection 9 4 Manufacturer s declaration 10 4 1 EU conformity CE symbol 10 4 2 Disposal 10 Contents d b Z5394 Rigging manual 1 2 en 3 ...

Страница 4: ...inspection of the items before use In case there is any doubt as to the proper functioning and safety of the items these must be withdrawn from use immediately Please also refer to Þ Chapter 3 Care and maintenance on page 9 1 1 3 Load safety information NOTICE The Z5394 Y Flying adapter is designed to suspend a total of 6 x Y8 or Y12 cabinets which corresponds to a total system weight of 123 kg 27...

Страница 5: ...also be downloaded at www dbaudio com In ArrayCalc the closest pickpoint hole and the exact distance in cm inch are displayed in the Main array section Þ Pickpoints and load last entry on the Rigging plot page provided the corresponding array is selected on this page Z5147 Rota clamp option Alternatively the array can be suspended and horizontally aligned from a single pickpoint using the d b Z514...

Страница 6: ...s and the maximum number of six cabinets that can be flown the assembly may be carried out either suspended or on the ground The following description refers to the suspended assembly 1 Prepare the first cabinet 1 At the front release the Locking pins of the Front links Þ The Front links will slide out automatically 2 On the rear release both Locking pins and fold out the Splay link 2 Attach the F...

Страница 7: ... are set at the central rear rigging strands of the cabinets and can be set in the range from 0 to 14 in 1 steps Preselect the splay angle according to your ArrayCalc simulation and insert and lock one Locking pin in the appropriate hole 5 Attach the next cabinet 1 Suspend the assembly according to the desired suspension option 2 Lift the assembly to a suitable working height 3 Attach the prepared...

Страница 8: ... first cabinet and ensure all Locking pins are properly inserted and locked Check all Front links on both sides of the cabinets and ensure all Locking pins are properly inserted and locked Check the splay angle settings and the Splay links on the rear of the cabinets and ensure all Locking pins are properly inserted and locked In Single pick point operation check the desired total vertical aiming ...

Страница 9: ...he rear rigging strand for obvious damage e g cracks deformation or corrosion including all drilled holes of the component Inspection of all fitting plates including front grills to ensure they are securely attached Regularly lubricate the sockets using WD 40 or a similar product Front and Splay links Visual inspection regarding deformation and damage e g cracks and corrosion including all drilled...

Страница 10: ...are that said products are in conformity with the provisions of the respective EC directives including all applicable amendments A detailed declaration is available on request and can be ordered from d b or downloaded from the d b website at www dbaudio com 4 2 Disposal When out of use the rigging components must be disposed of in accordance with the national environmental regulations Ensure that ...

Страница 11: ...D2719 EN 01 03 2021 d b audiotechnik GmbH Co KG www dbaudio com ...

Отзывы: