
11
MAIN ASSEMBLY
7.
Lower
first stage carrier (3)
into
hub (1G).
8.
Grease and place one each of
thrust washer (14)
,
thrust bearing (13)
, and
thrust washer (12)
, in that order, onto counterbore on the top of
first stage carrier sub-
assembly (3)
. Make sure the thickest thrust washer (#14) is nearest the carrier.
9.
Place
input gear (8)
into the center of
first stage carrier sub-assembly (3).
CAUTION: Beware sharp edges in the counterbore as “O” ring is installed.
10.
Place
cover (6),
interior side up, on work surface. Grease and place
“O” ring (5)
into the counterbore of
cover (6).
NOTE: The “O” ring can be made to fit the counterbore exactly by stretching its (if it is
too small) or by pinching it together bit by bit (if it is too large) as it is placed into the
counterbore.
11.
Grease one side of
thrust washer (7)
and place it into the counterbore in center
of cover.
12.
Place
cover (6)
onto
ring gear (4)
. Make sure the bolt holes in the ring gear and
cover are aligned. See Diagram 2: Pipe plug timing, on next page.
Содержание SPICER Torque-Hub S6B
Страница 1: ...Torque Hub Assembly Disassembly Manual S6B ...
Страница 20: ...15 TOOL LIST T 130717 ASSEMBLY PRESSING TOOL FOR BEARING CUP 1E ...
Страница 21: ...16 TOOL LIST T 156792 ASSEMBLY PRESSING TOOL FOR CUP 1C ...
Страница 22: ...17 TOOL LIST T 156766 AN_18 LOCKNUT WRENCH ...
Страница 23: ...18 TOOL LIST T 156799 ASSEMBLY PRESSING TOOL FOR SEAL 1B ...
Страница 24: ...19 TOOL LIST T 146588 ASSEMBLY PRESSING TOOL FOR BEARING CONE 1F ...