
10
MAIN ASSEMBLY
1.
Lower
second stage carrier sub-assembly (2)
into
hub (1G).
CAUTION: Beware sharp edges in the
counterbore as “O” ring is installed.
2.
Grease and place
“O” ring (5)
into the counterbore of
hub (1G)
.
NOTE: The “O” ring can be made to fit the counterbore exactly by stretching it (if it is too
small) or by pinching it together bit by bit (if it is too large) as it is palced into the
counterbore.
3.
Place
ring gear (4)
down onto
hub (1G)
, into mesh with
second stage carrier
sub-assembly (2)
. Make sure the bolt holes in hub and ring gear are aligned.
4.
With small end down, place
second stage sun gear (11)
down into mesh with
second stage carrier sub-assembly (2)
.
5.
Grease and palce one each of
thrust washer (14)
,
thrust bearing (13)
, and
thrust
washer (12)
, in that order, onto counterbore on the top of
second stage carrier sub-
assembly (2).
Make sure the thickest
thrust washer (#14)
is nearest the carrier.
6.
Grease and palce thrust
bearing carrier (10)
into the top of
second stage carrier
(2).
Содержание SPICER Torque-Hub S6B
Страница 1: ...Torque Hub Assembly Disassembly Manual S6B ...
Страница 20: ...15 TOOL LIST T 130717 ASSEMBLY PRESSING TOOL FOR BEARING CUP 1E ...
Страница 21: ...16 TOOL LIST T 156792 ASSEMBLY PRESSING TOOL FOR CUP 1C ...
Страница 22: ...17 TOOL LIST T 156766 AN_18 LOCKNUT WRENCH ...
Страница 23: ...18 TOOL LIST T 156799 ASSEMBLY PRESSING TOOL FOR SEAL 1B ...
Страница 24: ...19 TOOL LIST T 146588 ASSEMBLY PRESSING TOOL FOR BEARING CONE 1F ...