8
www.dallmeier.com
S5-S8
Commissioning
•
Earthing & Equipotential Bonding
For the safety of persons (protection against dangerous contact voltages) and devices (protection against over-voltages) as well as for the immunity of in
-
formation and communication technology equipment to electromagnetic interferences (EMI), all protective measures, which are specified by the currently
valid DIN, VDE and ISO standards and which provide for a standard-compliant earthing and a correct equipotential bonding of electrical and electronic
devices, are mandatory and must be fulfilled by all means.
•
Lightning Storms
To avoid damage to the device by electrical surge during lightning storms, all protective measures, which are specified by the currently valid DIN, VDE and
ISO standards and which provide for a standard-compliant lightning protection equipotential bonding, are mandatory and must be fulfilled by all means.
•
Operating Conditions
Unfavorable operating conditions may shorten the life of the device and may cause malfunctions, damages and data loss and may result in the loss of warranty.
Observe the specifications given in the technical data, the operating condition requirements and the maintenance instructions.
•
Foreign Bodies
If objects or liquids get into the device, immediately disconnect it from the power supply (pull out the power plug).
Contact the sales partner responsible for your area.
•
Burnt Smell
If you notice burnt smell or a formation of smoke coming from the device, immediately disconnect it from the power supply (pull out the power plug).
Contact the sales partner responsible for your area.
•
Opening
The device may only be opened by qualified personnel for inspection, maintenance and repair.
•
Disposal
Do not dispose waste electrical and electronic equipment into the household trash.
Disconnect the device from the power supply.
Remove all connected devices.
Return the device to your respective sales partner.
Содержание Panomera S7
Страница 1: ...English Commissioning 005110 1 0 3 2015 09 15 S5 S8...
Страница 18: ...18 www dallmeier com S5 S8 Commissioning 2 Slotted pan head screw with shoulder DIN 923 M6 4...
Страница 24: ...24 www dallmeier com S5 S8 Commissioning...
Страница 25: ...www dallmeier com 25 Commissioning S5 S8 Carefully remove the sun shield from the housing...
Страница 27: ...www dallmeier com 27 Commissioning S5 S8...
Страница 29: ...www dallmeier com 29 Commissioning S5 S8 Remove the plastic rails from the housing...
Страница 30: ...30 www dallmeier com S5 S8 Commissioning...
Страница 31: ...www dallmeier com 31 Commissioning S5 S8 2 Slotted pan head screw with shoulder DIN 923 M6 4...
Страница 36: ...36 www dallmeier com S5 S8 Commissioning 10 Connections Earthing grounding connection connecting thread M6...
Страница 43: ...Notes...