www.dallmeier.com
7
Commissioning
S5-S8
4 Safety Instructions
Only use the device if it is technically in proper working condition and for the intended purpose while keeping safety and potential dangers in mind.
•
Qualified Personnel
The installation, mounting, connection, commissioning and configuration of the device may only be carried out by qualified personnel.
This also applies to the maintenance, testing and repair, whereat the regulations of the DIN VDE 0701 series of standards (repair, modification and inspection
of electrical appliances) must be followed.
•
Regulations
The use of video and audio surveillance systems is, in general, strictly regulated.
Inform yourself about the currently valid laws and regulations regarding data, worker and environmental protection before using the device and ensure
compliance with them.
•
System Components
Only use internal components that have been tested and approved by Dallmeier.
Inappropriate internal components may cause malfunctions, damages and data loss and may result in the loss of warranty.
•
Modifications
Do not make any modifications to the hardware or software that have not been tested and approved by Dallmeier.
Inappropriate modifications may cause malfunctions, damages and data loss and may result in the loss of warranty.
•
Documentation
The product documentation contains several documents which are included in the scope of delivery in a printed form and/or on a digital medium.
Read the documents included in the delivery carefully and thoroughly.
Always follow the contained instructions, notes and warnings and observe the technical specifications in the product data sheet.
Keep all documents in legible condition and in a suitable location for future reference.
Regularly check the website www.dallmeier.com for the latest updates on product documentation.
•
Condensation Water
If the device is brought from a cold to a warm environment, resulting condensation water may cause malfunctions and damages.
In this case, wait (up to 8 hours) until the device has reached room temperature before commissioning.
Содержание Panomera S7
Страница 1: ...English Commissioning 005110 1 0 3 2015 09 15 S5 S8...
Страница 18: ...18 www dallmeier com S5 S8 Commissioning 2 Slotted pan head screw with shoulder DIN 923 M6 4...
Страница 24: ...24 www dallmeier com S5 S8 Commissioning...
Страница 25: ...www dallmeier com 25 Commissioning S5 S8 Carefully remove the sun shield from the housing...
Страница 27: ...www dallmeier com 27 Commissioning S5 S8...
Страница 29: ...www dallmeier com 29 Commissioning S5 S8 Remove the plastic rails from the housing...
Страница 30: ...30 www dallmeier com S5 S8 Commissioning...
Страница 31: ...www dallmeier com 31 Commissioning S5 S8 2 Slotted pan head screw with shoulder DIN 923 M6 4...
Страница 36: ...36 www dallmeier com S5 S8 Commissioning 10 Connections Earthing grounding connection connecting thread M6...
Страница 43: ...Notes...