4
www.dallmeier.com
S5-S8
Commissioning
1 Validity
This document applies to the following Panomera® Multifocal Sensor Systems:
•
Panomera® S5 – S8
Figures in this document may differ from the actual product.
2 Documents
The product documentation contains several documents which are included in the scope of delivery in a printed form and/or on a digital medium.
Read all documents included in the scope of delivery carefully and thoroughly before using the respective device or software application.
Always follow the instructions, notes and warnings and observe the technical specifications in the relevant product data sheet.
Keep all documents in legible condition and in a suitable location for future reference.
Regularly check the website www.dallmeier.com for the latest updates on product documentation.
2.1 This Document
Commissioning
The document “Commissioning” (this document) contains detailed descriptions of the installation, connection and commissioning of the above-mentioned
Panomera® Multifocal Sensor Systems as well as safety instructions and general notes.
The target audience of this document is trained system integrators.
Содержание Panomera S7
Страница 1: ...English Commissioning 005110 1 0 3 2015 09 15 S5 S8...
Страница 18: ...18 www dallmeier com S5 S8 Commissioning 2 Slotted pan head screw with shoulder DIN 923 M6 4...
Страница 24: ...24 www dallmeier com S5 S8 Commissioning...
Страница 25: ...www dallmeier com 25 Commissioning S5 S8 Carefully remove the sun shield from the housing...
Страница 27: ...www dallmeier com 27 Commissioning S5 S8...
Страница 29: ...www dallmeier com 29 Commissioning S5 S8 Remove the plastic rails from the housing...
Страница 30: ...30 www dallmeier com S5 S8 Commissioning...
Страница 31: ...www dallmeier com 31 Commissioning S5 S8 2 Slotted pan head screw with shoulder DIN 923 M6 4...
Страница 36: ...36 www dallmeier com S5 S8 Commissioning 10 Connections Earthing grounding connection connecting thread M6...
Страница 43: ...Notes...