18
COMMISSIONING – DDZ5200HD Indoor Series IM | REV. 1.0.0 | © 2021 Dallmeier
Earthing/Grounding
The device must be properly earthed/grounded in accordance with the locally
applicable regulations (regional and country-specific legal requirements and
standards) before commissioning.
NOTICE
Damage to the device or serious malfunctions due to the lack of or
improper earthing/grounding
Damage to electronic components caused by lightning strikes or over-volt-
ages (electrical surges) as well as malfunctions due to electromagnetic
interferences (EMI)
➡
Carry out all protective measures for a standard-compliant earthing/
grounding and a correct (lightning protection) equipotential bonding of
the device in accordance with the currently applicable DIN, VDE and ISO
standards in order to ensure the safety of the device (protection against
lightning strikes and over-voltages) and its immunity to electromagnetic
interferences (EMI).
Содержание DDZ5200HD Series
Страница 1: ...008267 REV 1 0 0 2021 02 02 COMMISSIONING DDZ5200HD Indoor Series In Ceiling Mount IM...
Страница 19: ......
Страница 25: ...25 COMMISSIONING DDZ5200HD Indoor Series IM REV 1 0 0 2021 Dallmeier Fig 4...
Страница 32: ...32 COMMISSIONING DDZ5200HD Indoor Series IM REV 1 0 0 2021 Dallmeier Fig 11 1 2...
Страница 37: ...37 COMMISSIONING DDZ5200HD Indoor Series IM REV 1 0 0 2021 Dallmeier Fig 16 Cover ring locked in place...
Страница 51: ......