Electrical Installation
13
Earth-ground rods must be installed and connected per local and national codes.
1.
Connect the auxiliary power connection to the panelboard.
2.
Connect the neutral power wire to the neutral bus.
3.
Connect the hot wires from the terminals to the panelboard lugs.
4.7 First Time Fire Up
After installing the display and DMS site equipment, test the site according to the field test
procedure. This ensures all equipment is installed properly and is operational. If a field test
procedure is not available, call Daktronics Transportation Customer Service to obtain a copy.