Section 2: Installation Preparation
2.1 Installation Planning
Prior to the display arriving on site, review installation plans with the electrician, ISP provider,
and members of the installation crew.
2.2 Support Ledger
Before the display arrives on site, ensure that the ledger brackets are mounted to the upright
I-beam. All ledger brackets must be installed prior to lifting the display to the head. For ledger
bracket details, refer to
DWG A-988359 in Appendix A.
2.3 Display Inspection
As soon as the display arrives on site, verify the packaging is in good condition. When unpacking
the display, inspect the display for damage and potential issues.
Photograph any damage and contact your Project Manager immediately to report issues. Failure
to report and document shipping damage may null and void any manufacturer's warranties.
Installation Preparation
Содержание 4200 Series
Страница 10: ......
Страница 12: ......
Страница 16: ...12 Display Installation ...
Страница 20: ...16 Section Splicing ...
Страница 22: ...18 Multi Direction Light Sensor Relocation ...
Страница 26: ......
Страница 28: ......
Страница 30: ......
Страница 34: ...30 First Time Power Up ...
Страница 36: ...32 Display Testing and Adjustment ...
Страница 38: ...34 Reference Drawings ...